TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C
TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C is a renovation/alteration project at TERMINAL A, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2015). The project has an estimated value of $80.0M.
Project Metrics
TDLR #EABPRJB3810375Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C is a Renovation/Alteration project located at TERMINAL A, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $80.0M. DFW AIRPORT is the property owner and JACOBS ENGINEERING is the design firm of record. The project was registered with TDLR on March 20, 2013.
Frequently Asked Questions
What is TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C?
TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C is a renovation/alteration project at TERMINAL A in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing Terminal A Section C
Is TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C open in Dfw Airport?
Construction on TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C is complete — TDLR records show the project passed its required accessibility inspection in Jun 2015. The building is finished and very likely open.
Where is TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C located?
TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C is located at TERMINAL A, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C?
DFW AIRPORT is the property owner/developer of record for TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C, per its TDLR project registration.
Who is the architect or design firm for TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C?
JACOBS ENGINEERING is the design firm of record for TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C, according to its TDLR filing.
How much does TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C cost and how big is it?
TA-PHASE 3 CD PKG 1 IMPRVMNTS SECTION C has an estimated construction value of $80.0M, based on its TDLR filing.
Scope of Work
Renovation of existing Terminal A Section C
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Compliance Timeline
Project Timeline
Filed
Mar 20, 2013
Review Complete
Inspection Complete
Closed
Jun 1, 2015
Related Projects
Same Owner
$3.8M totalSame Design Firm
$1.61B totalProperty Owner
Design Firm
Tarrant County Economy
Explore Area
Watch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.