DR UMAIR
DR UMAIR is a renovation/alteration project at 902 FROSTWOOD Suite 179, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2013). The project has an estimated value of $168K.
๐Project Metrics
TDLR #EABPRJB3815202Project Closed
Project has been completed and closed
DR UMAIR is a Renovation/Alteration project located at 902 FROSTWOOD Suite 179, Houston, TX 77024 in Houston, Texas. The project has an estimated value of $168K. METRONATIONAL is the property owner and IDENTITY ARCHITECTS is the design firm of record. The project was registered with TDLR on June 11, 2013.
โFrequently Asked Questions
What is DR UMAIR?
DR UMAIR is a renovation/alteration project at 902 FROSTWOOD Suite 179 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation of an existing medical office lease space
Is DR UMAIR open in Houston?
Construction on DR UMAIR is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2013. The building is finished and very likely open.
Where is DR UMAIR located?
DR UMAIR is located at 902 FROSTWOOD Suite 179, Houston, TX, 77024, in Harris County.
Who is the owner or developer of DR UMAIR?
METRONATIONAL is the property owner/developer of record for DR UMAIR, per its TDLR project registration.
Who is the architect or design firm for DR UMAIR?
IDENTITY ARCHITECTS is the design firm of record for DR UMAIR, according to its TDLR filing.
How much does DR UMAIR cost and how big is it?
DR UMAIR has an estimated construction value of $168K, based on its TDLR filing.
๐Scope of Work
renovation of an existing medical office lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 11, 2013
Review Complete
Inspection Complete
Closed
Oct 1, 2013