PINK is a renovation/alteration project at 7400 SAN PEDRO #1195, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $315K.
๐Project Metrics
TDLR #EABPRJB4805149Project Closed
Project has been completed and closed
PINK is a Renovation/Alteration project located at 7400 SAN PEDRO #1195, San Antonio, TX 78216 in San Antonio, Texas. The project has an estimated value of $315K. ELITE RETAIL SERVICES INC is the property owner and SHREMSHOCK ARCHITECTS is the design firm of record. The project was registered with TDLR on November 27, 2013.
โFrequently Asked Questions
What is PINK?
PINK is a renovation/alteration project at 7400 SAN PEDRO #1195 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of an existing retail tenant space in the mall for new "Pink" store
Is PINK open in San Antonio?
Construction on PINK is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is PINK located?
PINK is located at 7400 SAN PEDRO #1195, San Antonio, TX, 78216, in Bexar County.
Who is the owner or developer of PINK?
ELITE RETAIL SERVICES INC is the property owner/developer of record for PINK, per its TDLR project registration.
Who is the architect or design firm for PINK?
SHREMSHOCK ARCHITECTS is the design firm of record for PINK, according to its TDLR filing.
How much does PINK cost and how big is it?
PINK has an estimated construction value of $315K, based on its TDLR filing.
๐Scope of Work
Remodel of an existing retail tenant space in the mall for new "Pink" store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 27, 2013
Review Complete
Inspection Complete
Closed
Apr 1, 2014