LAKEWAY MUD W-3 CLEARWELL
๐Project Metrics
TDLR #EABPRJB4815049Project Closed
Project has been completed and closed
๐Scope of Work
Construct a new pre-stressed concrete ground water storage tank.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.3M total๐๏ธSame Design Firm
$3.3M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Dollar Install
Remove the existing electrical service equipment from the existing service pole. Install a new 150 amp main breaker service panel and meter loop on the existing pole. Connect existing loads to new panel. Remove the 100 amp conductors from the existing conduit to the house and install new 150 amp rated conductors to the house 150 amp main breaker service panel.
Replacement of mini-split system
Express: Remove and replace siding
Replacement of complete existing central heat and air system with or without duct work Lennox 4 Ton swap