Project has been completed and closed
MUD W-3 WATER TREATMENT PLANT is a New Construction project located at 4105 LAKEWAY BLVD., Lakeway, TX 78704 in Lakeway, Texas. The project has an estimated value of $2.0M. LAKEWAY MUNICIPAL UTILITY DISTRICT is the property owner and CASTLEBERRY ENGINEERING AND CONSULTING is the design firm of record. The project was registered with TDLR on March 11, 2015.
Construct a new pump station and associated piping.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 11, 2015
Review Complete
Inspection Complete
Closed
Nov 1, 2015
Building permits found at or near this location
ePlan: Residential Expedited Review - Remodel to Existing 1-Story Single Family Res Interior remodel of the existing kitchen dining and utility areas. No additions to the existing footprint and no work to the exterior.
ePlan: Residential Expedited Review - Remodel to Existing 1-Story Single Family Res Interior remodel of the existing kitchen dining and utility areas. No additions to the existing footprint and no work to the exterior. 3-31-26 JM - Permits voided. All interior remodel. This is ETJ. COA does not perform electric inspections pass the first point of disconnect building inspections or mechanical inspections. Water is supplied by private supplier.
pool
Replacement of complete existing central heat and air system with or without duct work
150-amp underground service rebuild
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis