US 62/82
US 62/82 is a new construction project at US 62/82, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2018). The project has an estimated value of $347K.
๐Project Metrics
TDLR #EABPRJB4818230Project Closed
Project has been completed and closed
US 62/82 is a New Construction project located at US 62/82, Lubbock, TX 79407 in Lubbock, Texas. The project has an estimated value of $347K. TXDOT DISTRICT: LUBBOCK is the property owner and TXDOT DISTRICT: LUBBOCK is the design firm of record. The project was registered with TDLR on July 3, 2014.
โFrequently Asked Questions
What is US 62/82?
US 62/82 is a new construction project at US 62/82 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Converting a non-freeway to a freeway, Phase 5B of the Marsha Sharp Freeway
Is US 62/82 open in Lubbock?
Construction on US 62/82 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2018. The building is finished and very likely open.
Where is US 62/82 located?
US 62/82 is located at US 62/82, Lubbock, TX, 79407, in Lubbock County.
Who is the owner or developer of US 62/82?
TXDOT DISTRICT: LUBBOCK is the property owner/developer of record for US 62/82, per its TDLR project registration.
Who is the architect or design firm for US 62/82?
TXDOT DISTRICT: LUBBOCK is the design firm of record for US 62/82, according to its TDLR filing.
How much does US 62/82 cost and how big is it?
US 62/82 has an estimated construction value of $347K, based on its TDLR filing.
๐Scope of Work
Converting a non-freeway to a freeway, Phase 5B of the Marsha Sharp Freeway
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 3, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2018
๐Related Projects
๐คSame Owner
$37.03B total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Lubbock County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Lubbock County
Find General Contractors in Lubbock