SPEC'S LIQUOR #114 SAN MARCOS
๐Project Metrics
TDLR #EABPRJB4820187Project Closed
Project has been completed and closed
๐Scope of Work
Interior bulidout to a first generation space. Includesnew restrooms and offices as well as MEP work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Express: Replace windowsdoors s4s.Gut kitchen&baths&all drywallinsulation as needed.New HVAC&ductwork.New elec fixtures & subpanel and main panel if needed.New plumbing fixtures. No walls or plumbing moving
Upgrade Electrical Service from Existing 200/200A to New 200/200A 120/240V Single Phase. Temporary Disconnect / Reconnect Required for Installation. We failed our solar inspection due to how the previous main panel upgrade was completed. The billing meter and main service panel are not spaced 2ยฟ apart and does not have a water tight conduit between. We will need to shift the meter socket over and install a proper conduit between the enclosures.
Replace 60ft of sewer line under home create two access point
Relocate existing electric residential water heater to a new interior closet location. Drain disconnect remove and properly dispose of existing water heater. Extend and modify existing domestic hot and cold water distribution piping to serve new water heater location. Install customer-provided electric storage-type water heater with required full-port shutoff valve approved drain pan pan drain piped by gravity to an approved exterior termination and temperature and pressure (T&P) relief valve discharge piping routed to an approved exterior termination in accordance with the 2021 Uniform Plumbing Code as adopted by the City of Austin. Install new laundry rough-in including recessed washer outlet box with hot and cold supplies standpipe and trapped 2-inch waste connection. Install approximately 50 linear feet of new 2-inch Schedule 40 PVC sanitary drain piping along the exterior of the structure and connect to existing building drain upstream of the sewage ejector system using approved fittings and methods.
Afton 2981-HC201-L New 1-Story Single Family Residence with (4) bedrooms (2) bathrooms Attached Garage Covered Patio & Porch Cafe