Project intelligenceTDLR EABPRJB5807046Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BAY CITY SIDEWALK IMPROVEMENTS AVE G

AVE G FROM 7TH ST TO 6TH ST, Bay City, TX, 77414

Construction complete · Jul 2015Project Closed

BAY CITY SIDEWALK IMPROVEMENTS AVE G is a renovation/alteration project at AVE G FROM 7TH ST TO 6TH ST, Bay City, in Matagorda County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2015). The project has an estimated value of $147K.

Estimated project value
$147K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 19, 2014194 days across supplied datesJul 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    72 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77414 (Bay City)

One email per change. Unsubscribe in one click. Privacy.

BAY CITY SIDEWALK IMPROVEMENTS AVE G is a Renovation/Alteration project located at AVE G FROM 7TH ST TO 6TH ST, Bay City, TX 77414 in Bay City, Texas. The project has an estimated value of $147K. CITY OF BAY CITY is the property owner and CIVILCORP LLC is the design firm of record. The project was registered with TDLR on December 19, 2014.

Frequently Asked Questions

What is BAY CITY SIDEWALK IMPROVEMENTS AVE G?

BAY CITY SIDEWALK IMPROVEMENTS AVE G is a renovation/alteration project at AVE G FROM 7TH ST TO 6TH ST in Bay City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace existing tile surface sidewalk with brick pavers, with concrete foundation.

Is BAY CITY SIDEWALK IMPROVEMENTS AVE G open in Bay City?

Construction on BAY CITY SIDEWALK IMPROVEMENTS AVE G is complete — TDLR records show the project passed its required accessibility inspection in Jul 2015. The building is finished and very likely open.

Where is BAY CITY SIDEWALK IMPROVEMENTS AVE G located?

BAY CITY SIDEWALK IMPROVEMENTS AVE G is located at AVE G FROM 7TH ST TO 6TH ST, Bay City, TX, 77414, in Matagorda County.

Who is the owner or developer of BAY CITY SIDEWALK IMPROVEMENTS AVE G?

CITY OF BAY CITY is the property owner/developer of record for BAY CITY SIDEWALK IMPROVEMENTS AVE G, per its TDLR project registration.

Who is the architect or design firm for BAY CITY SIDEWALK IMPROVEMENTS AVE G?

CIVILCORP LLC is the design firm of record for BAY CITY SIDEWALK IMPROVEMENTS AVE G, according to its TDLR filing.

How much does BAY CITY SIDEWALK IMPROVEMENTS AVE G cost and how big is it?

BAY CITY SIDEWALK IMPROVEMENTS AVE G has an estimated construction value of $147K, based on its TDLR filing.

Scope of Work

Remove and replace existing tile surface sidewalk with brick pavers, with concrete foundation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

AVE G FROM 7TH ST TO 6TH ST, Bay City, TX, 77414

28.98205, -95.96400

Watch all construction in 77414 (Bay City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Bay City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.