BALLEW SURETY
BALLEW SURETY is a additions to existing building project at 3802 MANCHACA ROAD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2016). The project has an estimated value of $190K.
๐Project Metrics
TDLR #EABPRJB5813215Project Closed
Project has been completed and closed
BALLEW SURETY is a Additions to Existing Building project located at 3802 MANCHACA ROAD, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $190K. DAVID S BALLEW is the property owner and FREY ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on April 6, 2015.
โFrequently Asked Questions
What is BALLEW SURETY?
BALLEW SURETY is a additions to existing building project at 3802 MANCHACA ROAD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office addition to rear of building and remodel of existing restrooms for accessibility
Is BALLEW SURETY open in Austin?
Construction on BALLEW SURETY is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2016. The building is finished and very likely open.
Where is BALLEW SURETY located?
BALLEW SURETY is located at 3802 MANCHACA ROAD, Austin, TX, 78704, in Travis County.
Who is the owner or developer of BALLEW SURETY?
DAVID S BALLEW is the property owner/developer of record for BALLEW SURETY, per its TDLR project registration.
Who is the architect or design firm for BALLEW SURETY?
FREY ARCHITECTS INC. is the design firm of record for BALLEW SURETY, according to its TDLR filing.
How much does BALLEW SURETY cost and how big is it?
BALLEW SURETY has an estimated construction value of $190K, based on its TDLR filing.
๐Scope of Work
Office addition to rear of building and remodel of existing restrooms for accessibility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 6, 2015
Review Complete
Inspection Complete
Closed
Jan 1, 2016
๐Related Projects
๐๏ธSame Design Firm
$5.7M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Replace existing electric water heater
Remodel to existing multi-family unit. Relocate dishwasher sink and fridge.
CHANGE OUT 2.5 TON (14 SEER) H/P CONDENSER W/ 2.5 TON 10KW HORIZ A/H UNIT C THIS IS LIKE FOR LIKE CHANGE OUT
๐Related Site Plans
City of Austin site plan approvals at this location