Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
K1.A02 CHEMICAL STORAGE SUITE FOR EH&S in Dallas, TX
5323 HARRY HINES BLVD., Dallas, TX, 75390
K1.A02 CHEMICAL STORAGE SUITE FOR EH&S is a renovation/alteration project at 5323 HARRY HINES BLVD., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2015). The project has an estimated value of $52K.
- Estimated project value
- $52K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
50 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
92 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75390 (Dallas)
One email per change. Unsubscribe in one click. Privacy.
K1.A02 CHEMICAL STORAGE SUITE FOR EH&S is a Renovation/Alteration project located at 5323 HARRY HINES BLVD., Dallas, TX 75390 in Dallas, Texas. The project has an estimated value of $52K. UT SOUTHWESTERN MEDICAL CENTER AT DALLAS is the property owner and UT SOUTHWESTERN PHYSICAL PLANT ARCHITECT is the design firm of record. The project was registered with TDLR on June 12, 2015.
Frequently Asked Questions
What is K1.A02 CHEMICAL STORAGE SUITE FOR EH&S?
K1.A02 CHEMICAL STORAGE SUITE FOR EH&S is a renovation/alteration project at 5323 HARRY HINES BLVD. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Selective demolition of flooring, doors, electrical systems, HVAC, etc., and reconstruction for storage type occ
Is K1.A02 CHEMICAL STORAGE SUITE FOR EH&S open in Dallas?
Construction on K1.A02 CHEMICAL STORAGE SUITE FOR EH&S is complete — TDLR records show the project passed its required accessibility inspection in Nov 2015. The building is finished and very likely open.
Where is K1.A02 CHEMICAL STORAGE SUITE FOR EH&S located?
K1.A02 CHEMICAL STORAGE SUITE FOR EH&S is located at 5323 HARRY HINES BLVD., Dallas, TX, 75390, in Dallas County.
Who is the owner or developer of K1.A02 CHEMICAL STORAGE SUITE FOR EH&S?
UT SOUTHWESTERN MEDICAL CENTER AT DALLAS is the property owner/developer of record for K1.A02 CHEMICAL STORAGE SUITE FOR EH&S, per its TDLR project registration.
Who is the architect or design firm for K1.A02 CHEMICAL STORAGE SUITE FOR EH&S?
UT SOUTHWESTERN PHYSICAL PLANT ARCHITECT is the design firm of record for K1.A02 CHEMICAL STORAGE SUITE FOR EH&S, according to its TDLR filing.
How much does K1.A02 CHEMICAL STORAGE SUITE FOR EH&S cost and how big is it?
K1.A02 CHEMICAL STORAGE SUITE FOR EH&S has an estimated construction value of $52K, based on its TDLR filing.
Scope of Work
Selective demolition of flooring, doors, electrical systems, HVAC, etc., and reconstruction for storage type occ
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5323 HARRY HINES BLVD., Dallas, TX, 75390
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75390 (Dallas)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dallas?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.