CRYSTAL FALLS PARKWAY - RIGHT TURN LANE
CRYSTAL FALLS PARKWAY - RIGHT TURN LANE is a renovation/alteration project at 1701 S. HWY 183, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2017). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB5820727Project Closed
Project has been completed and closed
CRYSTAL FALLS PARKWAY - RIGHT TURN LANE is a Renovation/Alteration project located at 1701 S. HWY 183, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $100K. CITY OF LEANDER is the property owner and HAYNIE CONSULTING INC. is the design firm of record. The project was registered with TDLR on July 27, 2015.
โFrequently Asked Questions
What is CRYSTAL FALLS PARKWAY - RIGHT TURN LANE?
CRYSTAL FALLS PARKWAY - RIGHT TURN LANE is a renovation/alteration project at 1701 S. HWY 183 in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of right-hand turn land from Crystal Falls Parkway (eastbound) to US 183 (southbound).
Is CRYSTAL FALLS PARKWAY - RIGHT TURN LANE open in Leander?
Construction on CRYSTAL FALLS PARKWAY - RIGHT TURN LANE is complete โ TDLR records show the project passed its required accessibility inspection in May 2017. The building is finished and very likely open.
Where is CRYSTAL FALLS PARKWAY - RIGHT TURN LANE located?
CRYSTAL FALLS PARKWAY - RIGHT TURN LANE is located at 1701 S. HWY 183, Leander, TX, 78641, in Williamson County.
Who is the owner or developer of CRYSTAL FALLS PARKWAY - RIGHT TURN LANE?
CITY OF LEANDER is the property owner/developer of record for CRYSTAL FALLS PARKWAY - RIGHT TURN LANE, per its TDLR project registration.
Who is the architect or design firm for CRYSTAL FALLS PARKWAY - RIGHT TURN LANE?
HAYNIE CONSULTING INC. is the design firm of record for CRYSTAL FALLS PARKWAY - RIGHT TURN LANE, according to its TDLR filing.
How much does CRYSTAL FALLS PARKWAY - RIGHT TURN LANE cost and how big is it?
CRYSTAL FALLS PARKWAY - RIGHT TURN LANE has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
Addition of right-hand turn land from Crystal Falls Parkway (eastbound) to US 183 (southbound).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 27, 2015
Review Complete
Inspection Complete
Closed
May 1, 2017
๐Related Projects
๐คSame Owner
$75.0M total๐๏ธSame Design Firm
$2.0M total๐Related City Permits
Building permits found at or near this location
RR-E02. Remove existing sign. Install 21.90 SF illuminated wall sign with push thru letters on North elevation.
RR-E01. Remove current cabinet. Replace with 56SF internally illuminated pylon cabinet on East elevation.
RR-E03 remove existing signage. Replace with illuminated wall sign with push thru letters.on East elevation.
RR-E05. Remove existing cabinet. Install illuminated wall sign with push thru letters on west elevation
RR-E04. Remove existing signage. Install illuminated wall sign w/push thru letters.