SITE STUFF PHASE II
SITE STUFF PHASE II is a renovation/alteration project at 12301 RESEARCH PARK BLVD. -Ste. 185, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2015). The project has an estimated value of $235K.
๐Project Metrics
TDLR #EABPRJB5821244Project Closed
Project has been completed and closed
SITE STUFF PHASE II is a Renovation/Alteration project located at 12301 RESEARCH PARK BLVD. -Ste. 185, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $235K. TRANSWESTERN is the property owner and LAUCKGROUP is the design firm of record. The project was registered with TDLR on August 4, 2015.
โFrequently Asked Questions
What is SITE STUFF PHASE II?
SITE STUFF PHASE II is a renovation/alteration project at 12301 RESEARCH PARK BLVD. -Ste. 185 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation
Is SITE STUFF PHASE II open in Austin?
Construction on SITE STUFF PHASE II is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2015. The building is finished and very likely open.
Where is SITE STUFF PHASE II located?
SITE STUFF PHASE II is located at 12301 RESEARCH PARK BLVD. -Ste. 185, Austin, TX, 78759, in Travis County.
Who is the owner or developer of SITE STUFF PHASE II?
TRANSWESTERN is the property owner/developer of record for SITE STUFF PHASE II, per its TDLR project registration.
Who is the architect or design firm for SITE STUFF PHASE II?
LAUCKGROUP is the design firm of record for SITE STUFF PHASE II, according to its TDLR filing.
How much does SITE STUFF PHASE II cost and how big is it?
SITE STUFF PHASE II has an estimated construction value of $235K, based on its TDLR filing.
๐Scope of Work
Interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 4, 2015
Review Complete
Inspection Complete
Closed
Nov 1, 2015
๐Related Projects
๐คSame Owner
$507.6M total๐Related City Permits
Building permits found at or near this location
Interior Alteration of Approx. (3895) of existing Suite 425.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)
Interior Alteration of Approx. (4810) of existing Suite 400.
Interior Alteration of Approx. (4810) of existing Suite 400.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)