DR. PAMEE SHAH
DR. PAMEE SHAH is a renovation/alteration project at 1154 LYDIA STREET, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $170K.
๐Project Metrics
TDLR #EABPRJB5821856Project Closed
Project has been completed and closed
DR. PAMEE SHAH is a Renovation/Alteration project located at 1154 LYDIA STREET, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $170K. HERMAN SCHEIFFER HOUSE is the property owner and MED TECH CONSTRUCTION is the design firm of record. The project was registered with TDLR on August 13, 2015.
โFrequently Asked Questions
What is DR. PAMEE SHAH?
DR. PAMEE SHAH is a renovation/alteration project at 1154 LYDIA STREET in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL TO A DENTAL OFFICE.
Is DR. PAMEE SHAH open in Austin?
Construction on DR. PAMEE SHAH is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.
Where is DR. PAMEE SHAH located?
DR. PAMEE SHAH is located at 1154 LYDIA STREET, Austin, TX, 78702, in Travis County.
Who is the owner or developer of DR. PAMEE SHAH?
HERMAN SCHEIFFER HOUSE is the property owner/developer of record for DR. PAMEE SHAH, per its TDLR project registration.
Who is the architect or design firm for DR. PAMEE SHAH?
MED TECH CONSTRUCTION is the design firm of record for DR. PAMEE SHAH, according to its TDLR filing.
How much does DR. PAMEE SHAH cost and how big is it?
DR. PAMEE SHAH has an estimated construction value of $170K, based on its TDLR filing.
๐Scope of Work
REMODEL TO A DENTAL OFFICE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 13, 2015
Review Complete
Inspection Complete
Closed
Dec 1, 2015
๐Related Projects
๐๏ธSame Design Firm
$34.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
installing and replacing broken bypass handle meter socket for a commercial residence 120/208 volt 225A three phase
The Bypass switch needs to be repaired.
Replacement of complete existing central heat and air system with or without duct work
change out 2 ton upflow air handler. this is a like for like change out
Replacement of complete existing central heat and air system with or without duct work
๐Related Site Plans
City of Austin site plan approvals at this location