MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF in Dallas, TX

CITY OF DALLAS ROW, Dallas, TX, 75246

Target date passed (Dec 2021)Review Complete

MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF is a new construction project at CITY OF DALLAS ROW, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2021 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $20.0M.

Estimated project value
$20.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 9, 20152,245 days across supplied datesDec 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2,130 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75246 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF is a New Construction project located at CITY OF DALLAS ROW, Dallas, TX 75246 in Dallas, Texas. The project has an estimated value of $20.0M. CITY OF DALLAS is the property owner and HALFF ASSSOCATES INC. is the design firm of record. The project was registered with TDLR on October 9, 2015.

Frequently Asked Questions

What is MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF?

MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF is a new construction project at CITY OF DALLAS ROW in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5 MILE LONG,30 FT DIAMETER DEEP TUNNEL W/RELATED STREETDRAINAGE & UTILITY IMPROVEMENTS & TUNNEL DEW VAR175(X4)

Is MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF open in Dallas?

MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF was scheduled to finish construction in Dec 2021 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF located?

MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF is located at CITY OF DALLAS ROW, Dallas, TX, 75246, in Dallas County.

Who is the owner or developer of MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF?

CITY OF DALLAS is the property owner/developer of record for MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF, per its TDLR project registration.

Who is the architect or design firm for MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF?

HALFF ASSSOCATES INC. is the design firm of record for MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF, according to its TDLR filing.

How much does MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF cost and how big is it?

MILL/PEAKS/STATE THOMAS DRAINAGE RELIEF has an estimated construction value of $20.0M, based on its TDLR filing.

Scope of Work

5 MILE LONG,30 FT DIAMETER DEEP TUNNEL W/RELATED STREETDRAINAGE & UTILITY IMPROVEMENTS & TUNNEL DEW VAR175(X4)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

CITY OF DALLAS ROW, Dallas, TX, 75246

Loading location map…
32.79325, -96.77215

Watch all construction in 75246 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.