CARROLLTON DOWNS PHASE 2 is a renovation/alteration project at LAKELAND-VALLEYWOOD- BRIARWOOD GATEWAY-NORTHSHORE-HALIFAX, Carrollton, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2017). The project has an estimated value of $1.5M.
Project has been completed and closed
CARROLLTON DOWNS PHASE 2 is a Renovation/Alteration project located at LAKELAND-VALLEYWOOD- BRIARWOOD GATEWAY-NORTHSHORE-HALIFAX, Carrollton, TX 75006 in Carrollton, Texas. The project has an estimated value of $1.5M. CITY OF CARROLLTON is the property owner and GRESHAM SMITH & PARTNERS is the design firm of record. The project was registered with TDLR on November 20, 2015.
CARROLLTON DOWNS PHASE 2 is a renovation/alteration project at LAKELAND-VALLEYWOOD- BRIARWOOD GATEWAY-NORTHSHORE-HALIFAX in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REPLACE EXISTING SIDEWALKS, CURB RAMPS AND CURBS.
Construction on CARROLLTON DOWNS PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2017. The building is finished and very likely open.
CARROLLTON DOWNS PHASE 2 is located at LAKELAND-VALLEYWOOD- BRIARWOOD GATEWAY-NORTHSHORE-HALIFAX, Carrollton, TX, 75006, in Dallas County.
CITY OF CARROLLTON is the property owner/developer of record for CARROLLTON DOWNS PHASE 2, per its TDLR project registration.
GRESHAM SMITH & PARTNERS is the design firm of record for CARROLLTON DOWNS PHASE 2, according to its TDLR filing.
CARROLLTON DOWNS PHASE 2 has an estimated construction value of $1.5M, based on its TDLR filing.
REPLACE EXISTING SIDEWALKS, CURB RAMPS AND CURBS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 20, 2015
Review Complete
Inspection Complete
Closed
Jul 1, 2017