Project intelligenceTDLR EABPRJB6807206Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

KIPP AUSTIN RIDGE CAMPUS PHASE III

8509 FM 969, BUILDING 627, Austin, TX, 78724

Construction complete · Jul 2017Project Closed

KIPP AUSTIN RIDGE CAMPUS PHASE III is a renovation/alteration project at 8509 FM 969, BUILDING 627, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2017). The project has an estimated value of $1.0M.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 23, 2015556 days across supplied datesJul 1, 2017

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    161 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    395 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78724 (Austin)

One email per change. Unsubscribe in one click. Privacy.

KIPP AUSTIN RIDGE CAMPUS PHASE III is a Renovation/Alteration project located at 8509 FM 969, BUILDING 627, Austin, TX 78724 in Austin, Texas. The project has an estimated value of $1.0M. KIPP: AUSTIN PUBLIC SCHOOLS is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on December 23, 2015.

Frequently Asked Questions

What is KIPP AUSTIN RIDGE CAMPUS PHASE III?

KIPP AUSTIN RIDGE CAMPUS PHASE III is a renovation/alteration project at 8509 FM 969, BUILDING 627 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing building.

Is KIPP AUSTIN RIDGE CAMPUS PHASE III open in Austin?

Construction on KIPP AUSTIN RIDGE CAMPUS PHASE III is complete — TDLR records show the project passed its required accessibility inspection in Jul 2017. The building is finished and very likely open.

Where is KIPP AUSTIN RIDGE CAMPUS PHASE III located?

KIPP AUSTIN RIDGE CAMPUS PHASE III is located at 8509 FM 969, BUILDING 627, Austin, TX, 78724, in Travis County.

Who is the owner or developer of KIPP AUSTIN RIDGE CAMPUS PHASE III?

KIPP: AUSTIN PUBLIC SCHOOLS is the property owner/developer of record for KIPP AUSTIN RIDGE CAMPUS PHASE III, per its TDLR project registration.

Who is the architect or design firm for KIPP AUSTIN RIDGE CAMPUS PHASE III?

STG DESIGN is the design firm of record for KIPP AUSTIN RIDGE CAMPUS PHASE III, according to its TDLR filing.

How much does KIPP AUSTIN RIDGE CAMPUS PHASE III cost and how big is it?

KIPP AUSTIN RIDGE CAMPUS PHASE III has an estimated construction value of $1.0M, based on its TDLR filing.

Scope of Work

Renovation to existing building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8509 FM 969, BUILDING 627, Austin, TX, 78724

Loading location map…
30.27724, -97.63809

Related City Permits

Building permits found at or near this location

8509 STILLWOOD LN
8.39 mi away

To install 16 solar modules and 1 battery

ActiveElectrical PermitAuxiliary PowerOct 2026
View Details
2026-130223 EP
ATMA Energy, INC
8509 STILLWOOD LN
8.39 mi away

Permit required for outage. Outage needed to connect solar system. Please reference Auxiliary Permit 2026-130223 EP

ActiveElectrical PermitRepairOct 2026
View Details
2026-130240 EP
ATMA Energy, INC
8509 ROCKWOOD LN
8.42 mi away

CDP - Request to Disconnect. Installation of a 200 Amp Automatic Transfer Switch for a generator

FinalElectrical PermitRepairSep 2026
View Details
2026-115123 EP
GRIZZLY AND SONS ELECTRIC LLC
8509 SHALLOT WAY
11.41 mi away

Tub to Shower conversion

FinalBuilding PermitRepairSep 2026
$1
View Details
2026-124187 BP
Diamond Home and Commercial Services LLC
8509 SHALLOT WAY
11.41 mi away

Tub to Shower conversion

FinalPlumbing PermitRepairSep 2026
View Details
2026-124187 PP
Diamond Plumbing

Related Site Plans

City of Austin site plan approvals at this location

Watch all construction in 78724 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.