Project intelligenceTDLR EABPRJB6808699Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

GMF AOC-III PHASE 4 in Arlington, TX

3801 SOUTH COLLINS ST, Arlington, TX, 76014

Construction complete · Jul 2016Project Closed

GMF AOC-III PHASE 4 is a renovation/alteration project at 3801 SOUTH COLLINS ST, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $2.9M.

Estimated project value
$2.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 25, 2016158 days across supplied datesJul 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76014 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

GMF AOC-III PHASE 4 is a Renovation/Alteration project located at 3801 SOUTH COLLINS ST, Arlington, TX 76014 in Arlington, Texas. The project has an estimated value of $2.9M. GM FINANCIAL is the property owner and MULTATECH is the design firm of record. The project was registered with TDLR on January 25, 2016.

Frequently Asked Questions

What is GMF AOC-III PHASE 4?

GMF AOC-III PHASE 4 is a renovation/alteration project at 3801 SOUTH COLLINS ST in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adaptive reuse of an existing building

Is GMF AOC-III PHASE 4 open in Arlington?

Construction on GMF AOC-III PHASE 4 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.

Where is GMF AOC-III PHASE 4 located?

GMF AOC-III PHASE 4 is located at 3801 SOUTH COLLINS ST, Arlington, TX, 76014, in Tarrant County.

Who is the owner or developer of GMF AOC-III PHASE 4?

GM FINANCIAL is the property owner/developer of record for GMF AOC-III PHASE 4, per its TDLR project registration.

Who is the architect or design firm for GMF AOC-III PHASE 4?

MULTATECH is the design firm of record for GMF AOC-III PHASE 4, according to its TDLR filing.

How much does GMF AOC-III PHASE 4 cost and how big is it?

GMF AOC-III PHASE 4 has an estimated construction value of $2.9M, based on its TDLR filing.

Scope of Work

Adaptive reuse of an existing building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3801 SOUTH COLLINS ST, Arlington, TX, 76014

Loading location map…
32.68271, -97.09466

Watch all construction in 76014 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Arlington?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.