BRISTOW LEVEL 6
BRISTOW LEVEL 6 is a renovation/alteration project at 2103 CITYWEST BLVD. Suite 400, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2017). The project has an estimated value of $350K.
๐Project Metrics
TDLR #EABPRJB6818920Project Closed
Project has been completed and closed
BRISTOW LEVEL 6 is a Renovation/Alteration project located at 2103 CITYWEST BLVD. Suite 400, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $350K. PARKWAY PROPERTIES is the property owner and ZIEGLER COOPER is the design firm of record. The project was registered with TDLR on June 17, 2016.
โFrequently Asked Questions
What is BRISTOW LEVEL 6?
BRISTOW LEVEL 6 is a renovation/alteration project at 2103 CITYWEST BLVD. Suite 400 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Cosmetic renovation of the full floor tenant space.
Is BRISTOW LEVEL 6 open in Houston?
Construction on BRISTOW LEVEL 6 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2017. The building is finished and very likely open.
Where is BRISTOW LEVEL 6 located?
BRISTOW LEVEL 6 is located at 2103 CITYWEST BLVD. Suite 400, Houston, TX, 77042, in Harris County.
Who is the owner or developer of BRISTOW LEVEL 6?
PARKWAY PROPERTIES is the property owner/developer of record for BRISTOW LEVEL 6, per its TDLR project registration.
Who is the architect or design firm for BRISTOW LEVEL 6?
ZIEGLER COOPER is the design firm of record for BRISTOW LEVEL 6, according to its TDLR filing.
How much does BRISTOW LEVEL 6 cost and how big is it?
BRISTOW LEVEL 6 has an estimated construction value of $350K, based on its TDLR filing.
๐Scope of Work
Cosmetic renovation of the full floor tenant space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 17, 2016
Review Complete
Inspection Complete
Closed
Oct 31, 2017