TAQUERIA KRYSTAL #2
TAQUERIA KRYSTAL #2 is a renovation/alteration project at 13600 N. FM 973, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2016). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB6819573Project Closed
Project has been completed and closed
TAQUERIA KRYSTAL #2 is a Renovation/Alteration project located at 13600 N. FM 973, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $75K. ADAM AWAD is the property owner and THOM EARNEST ARCHITECT is the design firm of record. The project was registered with TDLR on June 28, 2016.
โFrequently Asked Questions
What is TAQUERIA KRYSTAL #2?
TAQUERIA KRYSTAL #2 is a renovation/alteration project at 13600 N. FM 973 in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish Out of a portion of an Existing single story to a restaurant.
Is TAQUERIA KRYSTAL #2 open in Manor?
Construction on TAQUERIA KRYSTAL #2 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2016. The building is finished and very likely open.
Where is TAQUERIA KRYSTAL #2 located?
TAQUERIA KRYSTAL #2 is located at 13600 N. FM 973, Manor, TX, 78653, in Travis County.
Who is the owner or developer of TAQUERIA KRYSTAL #2?
ADAM AWAD is the property owner/developer of record for TAQUERIA KRYSTAL #2, per its TDLR project registration.
Who is the architect or design firm for TAQUERIA KRYSTAL #2?
THOM EARNEST ARCHITECT is the design firm of record for TAQUERIA KRYSTAL #2, according to its TDLR filing.
How much does TAQUERIA KRYSTAL #2 cost and how big is it?
TAQUERIA KRYSTAL #2 has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
Interior Finish Out of a portion of an Existing single story to a restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 28, 2016
Review Complete
Inspection Complete
Closed
Nov 1, 2016
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Express: Removing and replacing 2 windows like for like
Replacement of an existing water heater tank water heater change out 13600 Hymeadow Circle Austin TX 78729
Construct new driveway approach of 35 FT and sidewalk of 295 LF SP-2024-0265C 2026 022490 000 00 SSI
Installing brand new sprinkler system to entire property
My customer want to upgrade the electrical service from 100 amps to 200 amps. The service is mounted in a pole that I may be replace it depending on the AE spotter recommendation. The property has a mobile home around 1000 sq ft.