Construction complete ยท Dec 2019๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

RR12 GAS STATION

100 Springlake Dr, Dripping Springs, TX 78620, Dripping Springs, TX, 78620

RR12 GAS STATION is a new construction project at 100 Springlake Dr, Dripping Springs, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $450K across about 5,750 sq ft.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8821006
$450K
Project Value
5,750
Square Feet
$78/sqft
Cost/SqFt
1y 3mo
Duration
Registered:Jul 6, 2018
Start:Sep 1, 2018
Target:Dec 1, 2019
๐Ÿ

Project Closed

Project has been completed and closed

RR12 GAS STATION is a New Construction project located at 100 Springlake Dr, Dripping Springs, TX 78620 in Dripping Springs, Texas. The project has an estimated value of $450K covering 5,750 sq ft. ADAM AWAD is the property owner and TCHEN ARCHITECTS is the design firm of record. The project was registered with TDLR on July 6, 2018.

โ“Frequently Asked Questions

What is RR12 GAS STATION?

RR12 GAS STATION is a new construction project at 100 Springlake Dr in Dripping Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: construct a free-standing one(1)story steel framed building 5,750 sf

Is RR12 GAS STATION open in Dripping Springs?

Construction on RR12 GAS STATION is complete โ€” TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.

Where is RR12 GAS STATION located?

RR12 GAS STATION is located at 100 Springlake Dr, Dripping Springs, TX, 78620, in Hays County.

Who is the owner or developer of RR12 GAS STATION?

ADAM AWAD is the property owner/developer of record for RR12 GAS STATION, per its TDLR project registration.

Who is the architect or design firm for RR12 GAS STATION?

TCHEN ARCHITECTS is the design firm of record for RR12 GAS STATION, according to its TDLR filing.

How much does RR12 GAS STATION cost and how big is it?

RR12 GAS STATION has an estimated construction value of $450K and approximately 5,750 square feet (about $78/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

construct a free-standing one(1)story steel framed building 5,750 sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 6, 2018
Project Closed
December 1, 2019
Construction Start
September 1, 2018
Expected Completion
December 1, 2019

๐Ÿ“…Project Timeline

Filed

Jul 6, 2018

Review Complete

Inspection Complete

Closed

Dec 1, 2019

๐Ÿ“„Related City Permits

Building permits found at or near this location

10012 1/2 N MOPAC EXPY SVRD SB

SPECTRUM POWER SUPPLY BOX REPLACE *EMERGENCY INSPECTION 07/29/2026 KC566

ActiveElectrical PermitRepairJul 2026
View Details
2026-098223 EP
๐Ÿ”งLP General Services Contractor
10001 S IH 35 SVRD NB BLDG 1 UNIT 100

Replacement of any self-contained packaged units

ActiveMechanical PermitChange OutJul 2026
View Details
2026-096310 MP
๐Ÿ”งMJ2 Mechanical LLC
1000 GLEN OAK DR

Total Demo of a SFR 1048 sqft built in 1970. ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***

FinalPlumbing PermitDemolitionJul 2026
View Details
2026-093088 PP
๐Ÿ”งNueva Era Plumbing Services LLC
1000 LIBERTY PARK DR UNIT 409

Emergency service repair on main 100amp disconnect broken lug arching. AE emergency shut down so we can demo existing 30 year old 100amp main breaker disconnect and replace with new like for like.

FinalElectrical PermitRepairJul 2026
View Details
2026-091472 EP
๐Ÿ”งJFIG ELECTRIC SERVICE LLC
100 E HOME PL

ePlan: Residential Expedited Review - Three Unit Corner Bldg (100 E. Home Pl) New construction of 2-Story Single Family Res. [3bed 3.5bath] with Attached Garage

ActiveBuilding PermitNewJul 2026
View Details
2026-084972 BP
๐Ÿ”งTierra Gardens

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists