WHITE BOX
WHITE BOX is a renovation/alteration project at 2021 TOWN EAST BLVD Suite 1100, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2017). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB7808443Project Closed
Project has been completed and closed
WHITE BOX is a Renovation/Alteration project located at 2021 TOWN EAST BLVD Suite 1100, Mesquite, TX 75150 in Mesquite, Texas. The project has an estimated value of $200K. MORBEN REALTY COMPANY INC. is the property owner and RAA LLC is the design firm of record. The project was registered with TDLR on January 13, 2017.
โFrequently Asked Questions
What is WHITE BOX?
WHITE BOX is a renovation/alteration project at 2021 TOWN EAST BLVD Suite 1100 in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Whit Box finish-out in an existing center to include accessible toilets and break room.
Is WHITE BOX open in Mesquite?
Construction on WHITE BOX is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2017. The building is finished and very likely open.
Where is WHITE BOX located?
WHITE BOX is located at 2021 TOWN EAST BLVD Suite 1100, Mesquite, TX, 75150, in Dallas County.
Who is the owner or developer of WHITE BOX?
MORBEN REALTY COMPANY INC. is the property owner/developer of record for WHITE BOX, per its TDLR project registration.
Who is the architect or design firm for WHITE BOX?
RAA LLC is the design firm of record for WHITE BOX, according to its TDLR filing.
How much does WHITE BOX cost and how big is it?
WHITE BOX has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Whit Box finish-out in an existing center to include accessible toilets and break room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 13, 2017
Review Complete
Inspection Complete
Closed
Feb 1, 2017