RES Premier High School is a renovation/alteration project at 3733 W. Emporium Circle, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K across about 11,400 sq ft.
Design review complete, construction may proceed
RES Premier High School is a Renovation/Alteration project located at 3733 W. Emporium Circle, Mesquite, TX 75150 in Mesquite, Texas. The project has an estimated value of $150K covering 11,400 sq ft. USAR Mesquite is the property owner and RAA LLC is the design firm of record. The project was registered with TDLR on October 31, 2022.
RES Premier High School is a renovation/alteration project at 3733 W. Emporium Circle in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adding new Demising wall to separate the new lease from the rest of the building. Designating a new entry for the school. Adding two new tornado shelters outside the building.
RES Premier High School is currently under construction in Mesquite, TX. Its current TDLR status is "Review Complete".
RES Premier High School is located at 3733 W. Emporium Circle, Mesquite, TX, 75150, in Dallas County.
USAR Mesquite is the property owner/developer of record for RES Premier High School, per its TDLR project registration.
RAA LLC is the design firm of record for RES Premier High School, according to its TDLR filing.
RES Premier High School has an estimated construction value of $150K and approximately 11,400 square feet (about $13/sqft), based on its TDLR filing.
Adding new Demising wall to separate the new lease from the rest of the building. Designating a new entry for the school. Adding two new tornado shelters outside the building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 31, 2022
Review Complete
Oct 31, 2022
Inspection Complete
Closed