Project intelligenceTDLR EABPRJB7816870Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BEAVER ELEMENTARY SCHOOL in Garland, TX

3232 MARCH LN, Garland, TX, 75042

Construction complete · Apr 2018Inspection Complete

BEAVER ELEMENTARY SCHOOL is a renovation/alteration project at 3232 MARCH LN, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2018). The project has an estimated value of $2.0M.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 2017364 days across supplied datesApr 30, 2018

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    355 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75042 (Garland)

One email per change. Unsubscribe in one click. Privacy.

BEAVER ELEMENTARY SCHOOL is a Renovation/Alteration project located at 3232 MARCH LN, Garland, TX 75042 in Garland, Texas. The project has an estimated value of $2.0M. GARLAND INDEPENDENT SCHOOL DISTRICT is the property owner and HARRISONKORNBERG ARCHITECTS is the design firm of record. The project was registered with TDLR on May 10, 2017.

Frequently Asked Questions

What is BEAVER ELEMENTARY SCHOOL?

BEAVER ELEMENTARY SCHOOL is a renovation/alteration project at 3232 MARCH LN in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New entry vestibule addition, revised site layout at main entrance, renovation of existing restrooms, renovation

Is BEAVER ELEMENTARY SCHOOL open in Garland?

Construction on BEAVER ELEMENTARY SCHOOL is complete — TDLR records show the project passed its required accessibility inspection in Apr 2018. The building is finished and very likely open.

Where is BEAVER ELEMENTARY SCHOOL located?

BEAVER ELEMENTARY SCHOOL is located at 3232 MARCH LN, Garland, TX, 75042, in Dallas County.

Who is the owner or developer of BEAVER ELEMENTARY SCHOOL?

GARLAND INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for BEAVER ELEMENTARY SCHOOL, per its TDLR project registration.

Who is the architect or design firm for BEAVER ELEMENTARY SCHOOL?

HARRISONKORNBERG ARCHITECTS is the design firm of record for BEAVER ELEMENTARY SCHOOL, according to its TDLR filing.

How much does BEAVER ELEMENTARY SCHOOL cost and how big is it?

BEAVER ELEMENTARY SCHOOL has an estimated construction value of $2.0M, based on its TDLR filing.

Scope of Work

New entry vestibule addition, revised site layout at main entrance, renovation of existing restrooms, renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3232 MARCH LN, Garland, TX, 75042

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75042 (Garland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.