LAWSON MIDDLE SCHOOL in Houston, TX

14000 STANCLIFF ST., Houston, TX, 77045

Target date passed (Feb 2019)Review Complete

LAWSON MIDDLE SCHOOL is a additions to existing building project at 14000 STANCLIFF ST., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $13.0M.

Estimated project value
$13.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 19, 2018288 days across supplied datesFeb 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77045 (Houston)

One email per change. Unsubscribe in one click. Privacy.

LAWSON MIDDLE SCHOOL is a Additions to Existing Building project located at 14000 STANCLIFF ST., Houston, TX 77045 in Houston, Texas. The project has an estimated value of $13.0M. HOUSTON INDEPENDENT SCHOOL DISTRICT is the property owner and HARRISONKORNBERG ARCHITECTS is the design firm of record. The project was registered with TDLR on April 19, 2018.

Frequently Asked Questions

What is LAWSON MIDDLE SCHOOL?

LAWSON MIDDLE SCHOOL is a additions to existing building project at 14000 STANCLIFF ST. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADDITION TO NEW MIDDLE SCHOOL BUILDING OF TWO NON-SIMULTANEOUS CLASSROOMS

Is LAWSON MIDDLE SCHOOL open in Houston?

LAWSON MIDDLE SCHOOL was scheduled to finish construction in Feb 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is LAWSON MIDDLE SCHOOL located?

LAWSON MIDDLE SCHOOL is located at 14000 STANCLIFF ST., Houston, TX, 77045, in Harris County.

Who is the owner or developer of LAWSON MIDDLE SCHOOL?

HOUSTON INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for LAWSON MIDDLE SCHOOL, per its TDLR project registration.

Who is the architect or design firm for LAWSON MIDDLE SCHOOL?

HARRISONKORNBERG ARCHITECTS is the design firm of record for LAWSON MIDDLE SCHOOL, according to its TDLR filing.

How much does LAWSON MIDDLE SCHOOL cost and how big is it?

LAWSON MIDDLE SCHOOL has an estimated construction value of $13.0M, based on its TDLR filing.

Scope of Work

ADDITION TO NEW MIDDLE SCHOOL BUILDING OF TWO NON-SIMULTANEOUS CLASSROOMS

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

14000 STANCLIFF ST., Houston, TX, 77045

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77045 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.