MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ

VARIOUS CITY STREETS, Midland, TX, 79701

Construction complete · Sep 2018Project Closed

MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ is a new construction project at VARIOUS CITY STREETS, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $2.0M.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 7, 2017298 days across supplied datesSep 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79701 (Midland)

One email per change. Unsubscribe in one click. Privacy.

MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ is a New Construction project located at VARIOUS CITY STREETS, Midland, TX 79701 in Midland, Texas. The project has an estimated value of $2.0M. CITY OF MIDLAND GENERAL SERV DEPT is the property owner and CITY OF MIDLAND ENGINEERING SERV DEPT is the design firm of record. The project was registered with TDLR on November 7, 2017.

Frequently Asked Questions

What is MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ?

MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ is a new construction project at VARIOUS CITY STREETS in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct new 5ft concrete sidewalks on Carver Street &Scharbauer Drive including accessible pedestrian ramps a

Is MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ open in Midland?

Construction on MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ is complete — TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.

Where is MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ located?

MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ is located at VARIOUS CITY STREETS, Midland, TX, 79701, in Midland County.

Who is the owner or developer of MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ?

CITY OF MIDLAND GENERAL SERV DEPT is the property owner/developer of record for MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ, per its TDLR project registration.

Who is the architect or design firm for MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ?

CITY OF MIDLAND ENGINEERING SERV DEPT is the design firm of record for MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ, according to its TDLR filing.

How much does MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ cost and how big is it?

MIDLAND CARVER RDWY&CULVERT CROSSINGPROJ has an estimated construction value of $2.0M, based on its TDLR filing.

Scope of Work

Construct new 5ft concrete sidewalks on Carver Street &Scharbauer Drive including accessible pedestrian ramps a

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

VARIOUS CITY STREETS, Midland, TX, 79701

Loading location map…
31.99160, -102.08325

Watch all construction in 79701 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.