Project intelligenceTDLR EABPRJB9801541New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CITY OF MIDLAND TRADEWINDS BLVD PAVING P

TRADEWINDS BLVD (FROM THOMASON Dr. to Gateway Plaza), Midland, TX, 79701

Construction complete · Jan 2020Project Closed

CITY OF MIDLAND TRADEWINDS BLVD PAVING P is a new construction project at TRADEWINDS BLVD (FROM THOMASON Dr. to Gateway Plaza), Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2020). The project has an estimated value of $8.0M across about 250 sq ft.

Estimated project value
$8.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$32.11K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 24, 2018494 days across supplied datesJan 31, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    456 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79701 (Midland)

One email per change. Unsubscribe in one click. Privacy.

CITY OF MIDLAND TRADEWINDS BLVD PAVING P is a New Construction project located at TRADEWINDS BLVD (FROM THOMASON Dr. to Gateway Plaza), Midland, TX 79701 in Midland, Texas. The project has an estimated value of $8.0M covering 250 sq ft. CITY OF MIDLAND GENERAL SERV DEPT is the property owner and KIMLEY-HORN AND ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on September 24, 2018.

Frequently Asked Questions

What is CITY OF MIDLAND TRADEWINDS BLVD PAVING P?

CITY OF MIDLAND TRADEWINDS BLVD PAVING P is a new construction project at TRADEWINDS BLVD (FROM THOMASON Dr. to Gateway Plaza) in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct new 5ft concrete sidewalks, curb ramps, curb &gutter and roadway on Tradewinds Blvd. from Thomason Dr

Is CITY OF MIDLAND TRADEWINDS BLVD PAVING P open in Midland?

Construction on CITY OF MIDLAND TRADEWINDS BLVD PAVING P is complete — TDLR records show the project passed its required accessibility inspection in Jan 2020. The building is finished and very likely open.

Where is CITY OF MIDLAND TRADEWINDS BLVD PAVING P located?

CITY OF MIDLAND TRADEWINDS BLVD PAVING P is located at TRADEWINDS BLVD (FROM THOMASON Dr. to Gateway Plaza), Midland, TX, 79701, in Midland County.

Who is the owner or developer of CITY OF MIDLAND TRADEWINDS BLVD PAVING P?

CITY OF MIDLAND GENERAL SERV DEPT is the property owner/developer of record for CITY OF MIDLAND TRADEWINDS BLVD PAVING P, per its TDLR project registration.

Who is the architect or design firm for CITY OF MIDLAND TRADEWINDS BLVD PAVING P?

KIMLEY-HORN AND ASSOCIATES INC. is the design firm of record for CITY OF MIDLAND TRADEWINDS BLVD PAVING P, according to its TDLR filing.

How much does CITY OF MIDLAND TRADEWINDS BLVD PAVING P cost and how big is it?

CITY OF MIDLAND TRADEWINDS BLVD PAVING P has an estimated construction value of $8.0M and approximately 250 square feet (about $32.11K/sqft), based on its TDLR filing.

Scope of Work

Construct new 5ft concrete sidewalks, curb ramps, curb &gutter and roadway on Tradewinds Blvd. from Thomason Dr

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

TRADEWINDS BLVD (FROM THOMASON Dr. to Gateway Plaza), Midland, TX, 79701

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79701 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.