Project intelligenceTDLR EABPRJB8810343New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MISD | IRVIN REPLACEMENT SCHOOL in Midlothian, TX

S 5TH STREET, Midlothian, TX, 76065

Target date passed (Aug 2019)Review Complete

MISD | IRVIN REPLACEMENT SCHOOL is a new construction project at S 5TH STREET, Midlothian, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $22.7M.

Estimated project value
$22.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 12, 2018535 days across supplied datesAug 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    487 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76065 (Midlothian)

One email per change. Unsubscribe in one click. Privacy.

MISD | IRVIN REPLACEMENT SCHOOL is a New Construction project located at S 5TH STREET, Midlothian, TX 76065 in Midlothian, Texas. The project has an estimated value of $22.7M. MIDLOTHIAN ISD is the property owner and HUCKABEE is the design firm of record. The project was registered with TDLR on February 12, 2018.

Frequently Asked Questions

What is MISD | IRVIN REPLACEMENT SCHOOL?

MISD | IRVIN REPLACEMENT SCHOOL is a new construction project at S 5TH STREET in Midlothian, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new Irvin replacement elementary school for MidlothianISD.

Is MISD | IRVIN REPLACEMENT SCHOOL open in Midlothian?

MISD | IRVIN REPLACEMENT SCHOOL was scheduled to finish construction in Aug 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is MISD | IRVIN REPLACEMENT SCHOOL located?

MISD | IRVIN REPLACEMENT SCHOOL is located at S 5TH STREET, Midlothian, TX, 76065, in Johnson County.

Who is the owner or developer of MISD | IRVIN REPLACEMENT SCHOOL?

MIDLOTHIAN ISD is the property owner/developer of record for MISD | IRVIN REPLACEMENT SCHOOL, per its TDLR project registration.

Who is the architect or design firm for MISD | IRVIN REPLACEMENT SCHOOL?

HUCKABEE is the design firm of record for MISD | IRVIN REPLACEMENT SCHOOL, according to its TDLR filing.

How much does MISD | IRVIN REPLACEMENT SCHOOL cost and how big is it?

MISD | IRVIN REPLACEMENT SCHOOL has an estimated construction value of $22.7M, based on its TDLR filing.

Scope of Work

A new Irvin replacement elementary school for MidlothianISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

S 5TH STREET, Midlothian, TX, 76065

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76065 (Midlothian)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Midlothian?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.