Project intelligenceTDLR EABPRJB8815815Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

AISD | CHARLES HEAD STADIUM TRACK RENOV

1300 N. CUMMINGS, Alvarado, TX, 76009

Target date passed (Jul 2018)Review Complete

AISD | CHARLES HEAD STADIUM TRACK RENOV is a renovation/alteration project at 1300 N. CUMMINGS, Alvarado, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2018 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $240K.

Estimated project value
$240K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 26, 201866 days across supplied datesJul 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76009 (Alvarado)

One email per change. Unsubscribe in one click. Privacy.

AISD | CHARLES HEAD STADIUM TRACK RENOV is a Renovation/Alteration project located at 1300 N. CUMMINGS, Alvarado, TX 76009 in Alvarado, Texas. The project has an estimated value of $240K. ALVARADO ISD is the property owner and HUCKABEE is the design firm of record. The project was registered with TDLR on April 26, 2018.

Frequently Asked Questions

What is AISD | CHARLES HEAD STADIUM TRACK RENOV?

AISD | CHARLES HEAD STADIUM TRACK RENOV is a renovation/alteration project at 1300 N. CUMMINGS in Alvarado, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Charles Head Stadium track resurfacing and paving for Alvarado ISD.

Is AISD | CHARLES HEAD STADIUM TRACK RENOV open in Alvarado?

AISD | CHARLES HEAD STADIUM TRACK RENOV was scheduled to finish construction in Jul 2018 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is AISD | CHARLES HEAD STADIUM TRACK RENOV located?

AISD | CHARLES HEAD STADIUM TRACK RENOV is located at 1300 N. CUMMINGS, Alvarado, TX, 76009, in Johnson County.

Who is the owner or developer of AISD | CHARLES HEAD STADIUM TRACK RENOV?

ALVARADO ISD is the property owner/developer of record for AISD | CHARLES HEAD STADIUM TRACK RENOV, per its TDLR project registration.

Who is the architect or design firm for AISD | CHARLES HEAD STADIUM TRACK RENOV?

HUCKABEE is the design firm of record for AISD | CHARLES HEAD STADIUM TRACK RENOV, according to its TDLR filing.

How much does AISD | CHARLES HEAD STADIUM TRACK RENOV cost and how big is it?

AISD | CHARLES HEAD STADIUM TRACK RENOV has an estimated construction value of $240K, based on its TDLR filing.

Scope of Work

Charles Head Stadium track resurfacing and paving for Alvarado ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1300 N. CUMMINGS, Alvarado, TX, 76009

32.42456, -97.21462

Watch all construction in 76009 (Alvarado)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Alvarado?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.