Project intelligenceTDLR EABPRJB8818276New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

NISD | NEW ELEMENTARY SCHOOL NO. 19

HAWKS WAY, Northlake, TX, 76226

Construction complete · Aug 2019Inspection Complete

NISD | NEW ELEMENTARY SCHOOL NO. 19 is a new construction project at HAWKS WAY, Northlake, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $25.0M.

Estimated project value
$25.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 30, 2018428 days across supplied datesAug 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    396 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76226 (Northlake)

One email per change. Unsubscribe in one click. Privacy.

NISD | NEW ELEMENTARY SCHOOL NO. 19 is a New Construction project located at HAWKS WAY, Northlake, TX 76226 in Northlake, Texas. The project has an estimated value of $25.0M. NORTHWEST ISD is the property owner and HUCKABEE is the design firm of record. The project was registered with TDLR on May 30, 2018.

Frequently Asked Questions

What is NISD | NEW ELEMENTARY SCHOOL NO. 19?

NISD | NEW ELEMENTARY SCHOOL NO. 19 is a new construction project at HAWKS WAY in Northlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A New Elementary School No. 19 for Northwest ISD.

Is NISD | NEW ELEMENTARY SCHOOL NO. 19 open in Northlake?

Construction on NISD | NEW ELEMENTARY SCHOOL NO. 19 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.

Where is NISD | NEW ELEMENTARY SCHOOL NO. 19 located?

NISD | NEW ELEMENTARY SCHOOL NO. 19 is located at HAWKS WAY, Northlake, TX, 76226, in Denton County.

Who is the owner or developer of NISD | NEW ELEMENTARY SCHOOL NO. 19?

NORTHWEST ISD is the property owner/developer of record for NISD | NEW ELEMENTARY SCHOOL NO. 19, per its TDLR project registration.

Who is the architect or design firm for NISD | NEW ELEMENTARY SCHOOL NO. 19?

HUCKABEE is the design firm of record for NISD | NEW ELEMENTARY SCHOOL NO. 19, according to its TDLR filing.

How much does NISD | NEW ELEMENTARY SCHOOL NO. 19 cost and how big is it?

NISD | NEW ELEMENTARY SCHOOL NO. 19 has an estimated construction value of $25.0M, based on its TDLR filing.

Scope of Work

A New Elementary School No. 19 for Northwest ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

HAWKS WAY, Northlake, TX, 76226

Location by street address

Watch all construction in 76226 (Northlake)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Northlake?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.