BEARD VAPE CO is a renovation/alteration project at 4500 SOUTH PLEASANT VALLEY RD STE 105, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $300K.
Project has been completed and closed
BEARD VAPE CO is a Renovation/Alteration project located at 4500 SOUTH PLEASANT VALLEY RD STE 105, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $300K. MARC ALLEN is the property owner and METHOD ARCHITECTURE AUSTIN is the design firm of record. The project was registered with TDLR on June 14, 2018.
BEARD VAPE CO is a renovation/alteration project at 4500 SOUTH PLEASANT VALLEY RD STE 105 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR BUILDOUT IN EXISTING BUILDING
Construction on BEARD VAPE CO is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.
BEARD VAPE CO is located at 4500 SOUTH PLEASANT VALLEY RD STE 105, Austin, TX, 78744, in Travis County.
MARC ALLEN is the property owner/developer of record for BEARD VAPE CO, per its TDLR project registration.
METHOD ARCHITECTURE AUSTIN is the design firm of record for BEARD VAPE CO, according to its TDLR filing.
BEARD VAPE CO has an estimated construction value of $300K, based on its TDLR filing.
INTERIOR BUILDOUT IN EXISTING BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 14, 2018
Review Complete
Inspection Complete
Closed
Sep 1, 2018
Building permits found at or near this location
disconnect/reconnect Maintenance Permit Check and test breakers/ clean equipment
Adding a single occupancy visitors restroom inside the existing school building
Express: Replace composite roof with metal roof replacing window for window
Adding a single occupancy visitors restroom inside the existing school building
Install 200amp overhead HBL for construction power