SOUTH PARK V is a renovation/alteration project at 4500 SOUTH PLEASANT VALLEY RD 200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $625K.
Design review complete, construction may proceed
SOUTH PARK V is a Renovation/Alteration project located at 4500 SOUTH PLEASANT VALLEY RD 200, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $625K. TRANSWESTERN is the property owner and METHOD ARCHITECTURE AUSTIN is the design firm of record. The project was registered with TDLR on June 20, 2018.
SOUTH PARK V is a renovation/alteration project at 4500 SOUTH PLEASANT VALLEY RD 200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR BUILDOUT IN EXISTING BUILDING
SOUTH PARK V is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
SOUTH PARK V is located at 4500 SOUTH PLEASANT VALLEY RD 200, Austin, TX, 78744, in Travis County.
TRANSWESTERN is the property owner/developer of record for SOUTH PARK V, per its TDLR project registration.
METHOD ARCHITECTURE AUSTIN is the design firm of record for SOUTH PARK V, according to its TDLR filing.
SOUTH PARK V has an estimated construction value of $625K, based on its TDLR filing.
INTERIOR BUILDOUT IN EXISTING BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 20, 2018
Review Complete
Jun 20, 2018
Inspection Complete
Closed
Building permits found at or near this location
disconnect/reconnect Maintenance Permit Check and test breakers/ clean equipment
Adding a single occupancy visitors restroom inside the existing school building
Express: Replace composite roof with metal roof replacing window for window
Adding a single occupancy visitors restroom inside the existing school building
Install 200amp overhead HBL for construction power