17TH FLOOR DEMO
17TH FLOOR DEMO is a renovation/alteration project at 100 THROCKMORTON STREET 17th Floor, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB8823814Project Closed
Project has been completed and closed
17TH FLOOR DEMO is a Renovation/Alteration project located at 100 THROCKMORTON STREET 17th Floor, Fort Worth, TX 76102 in Fort Worth, Texas. The project has an estimated value of $80K. SPIRE REALTY is the property owner and IDGROUP is the design firm of record. The project was registered with TDLR on August 14, 2018.
โFrequently Asked Questions
What is 17TH FLOOR DEMO?
17TH FLOOR DEMO is a renovation/alteration project at 100 THROCKMORTON STREET 17th Floor in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Demolition Only of an Existing Full Floor
Is 17TH FLOOR DEMO open in Fort Worth?
Construction on 17TH FLOOR DEMO is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.
Where is 17TH FLOOR DEMO located?
17TH FLOOR DEMO is located at 100 THROCKMORTON STREET 17th Floor, Fort Worth, TX, 76102, in Tarrant County.
Who is the owner or developer of 17TH FLOOR DEMO?
SPIRE REALTY is the property owner/developer of record for 17TH FLOOR DEMO, per its TDLR project registration.
Who is the architect or design firm for 17TH FLOOR DEMO?
IDGROUP is the design firm of record for 17TH FLOOR DEMO, according to its TDLR filing.
How much does 17TH FLOOR DEMO cost and how big is it?
17TH FLOOR DEMO has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Interior Demolition Only of an Existing Full Floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 14, 2018
Review Complete
Inspection Complete
Closed
Sep 1, 2018