Project has been completed and closed
HILLTOP FREEDMAN'S APARTMENTS is a New Construction project located at 2400 SAN GABRIEL STREET, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $56.5M. 2402 HILLTOP LP BY PORTDAV MANAGEMENT LL is the property owner and STG DESIGN INC is the design firm of record. The project was registered with TDLR on August 21, 2018.
294,590 sqft, 8 story student housing apartment buildingplus 2.5 levels of below grade parking within Austin Ou
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 21, 2018
Review Complete
Inspection Complete
Closed
Jul 1, 2020
Building permits found at or near this location
Express: Foundation repair
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Update 6/1/26 LS- 2 phase project. Both bathrooms are being remodel. GC will complete primary bathroom and then call in inspections for second guest bathroom. Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
We want to install a Battery at this residence. We will be installing downstream of main service disconnect.
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis