Construction complete ยท Dec 2015๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

KIPP NORTH CAMPUS: KITCHEN

8004 CAMERON, Austin, TX 78754, Austin, TX, 78754

KIPP NORTH CAMPUS: KITCHEN is a renovation/alteration project at 8004 CAMERON, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $400K.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB5809580
$400K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
6 months
Duration
Registered:Feb 9, 2015
Start:Jun 1, 2015
Target:Dec 1, 2015
๐Ÿ

Project Closed

Project has been completed and closed

KIPP NORTH CAMPUS: KITCHEN is a Renovation/Alteration project located at 8004 CAMERON, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $400K. KIPP: AUSTIN PUBLIC SCHOOLS is the property owner and STG DESIGN INC is the design firm of record. The project was registered with TDLR on February 9, 2015.

โ“Frequently Asked Questions

What is KIPP NORTH CAMPUS: KITCHEN?

KIPP NORTH CAMPUS: KITCHEN is a renovation/alteration project at 8004 CAMERON in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of a new kitchen for Elementary School within existing building. The rest of the school is being p

Is KIPP NORTH CAMPUS: KITCHEN open in Austin?

Construction on KIPP NORTH CAMPUS: KITCHEN is complete โ€” TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.

Where is KIPP NORTH CAMPUS: KITCHEN located?

KIPP NORTH CAMPUS: KITCHEN is located at 8004 CAMERON, Austin, TX, 78754, in Travis County.

Who is the owner or developer of KIPP NORTH CAMPUS: KITCHEN?

KIPP: AUSTIN PUBLIC SCHOOLS is the property owner/developer of record for KIPP NORTH CAMPUS: KITCHEN, per its TDLR project registration.

Who is the architect or design firm for KIPP NORTH CAMPUS: KITCHEN?

STG DESIGN INC is the design firm of record for KIPP NORTH CAMPUS: KITCHEN, according to its TDLR filing.

How much does KIPP NORTH CAMPUS: KITCHEN cost and how big is it?

KIPP NORTH CAMPUS: KITCHEN has an estimated construction value of $400K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Installation of a new kitchen for Elementary School within existing building. The rest of the school is being p

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
February 9, 2015
Project Closed
December 1, 2015
Construction Start
June 1, 2015
Expected Completion
December 1, 2015

๐Ÿ“…Project Timeline

Filed

Feb 9, 2015

Review Complete

Inspection Complete

Closed

Dec 1, 2015

๐Ÿ“Location & Views

Open in MapsGet Directions|30.33463, -97.68515

๐Ÿ“„Related City Permits

Building permits found at or near this location

8004 CAMDEN DR
2.96 mi away

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

ActiveMechanical PermitChange OutJun 2026
View Details
2026-079236 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
8004 CAMDEN DR
2.96 mi away

Replacement of an existing water heater water heater change out 8004 Camden Drive Austin TX 78757

ActivePlumbing PermitChange OutJun 2026
View Details
2026-076125 PP
๐Ÿ”งRadiant Plumbing & AC
8004 ALOPHIA DR
17.34 mi away

Replacement of an existing water heater Replace Navien 240a2 Gas Tankless Water Heater Location: 2nd floor attic

FinalPlumbing PermitChange OutJun 2026
View Details
2026-080060 PP
๐Ÿ”งAmerican Residential Services (ARS) - Rescue Rooter
8004 BIRD SONG CIR

New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (Unit A) Revision 1: a 611 inspection was triggered and now it needs to be removed from multiple addresses. We need to to switch a water tap inspection from yes to not required

ActiveBuilding PermitNewMay 2026
View Details
2026-059697 BP
๐Ÿ”งNew Home Co
8004 PONCHO PASS

Irrigation Installation

FinalPlumbing PermitIrrigationFeb 2026
View Details
2026-023119 PP

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists