โœ…Inspection Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

CP710803 SZB: MOVE PROJECT 2021 FROM FAC

1912 SPEEDWAY, Austin, TX 78712, Austin, TX, 78712
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8824572
$1.1M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
3 months
Duration
Registered:Aug 24, 2018
Start:Sep 1, 2018
Target:Dec 1, 2018
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

๐Ÿ“‹Scope of Work

MOVE PROJECT 2021 FROM FAC AND GSB TO SZB

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 24, 2018
Construction Start
September 1, 2018
Expected Completion
December 1, 2018

๐Ÿ“Location & Views

Open in MapsGet Directions|30.28193, -97.73766

๐Ÿ“„Related City Permits

Building permits found at or near this location

1912 E 21ST ST
1.00 mi away

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Two Stage Gas - DOWNSTAIRS

ActiveMechanical PermitChange OutOct 2025
View Details
2025-133502 MP
๐Ÿ”งStan's Heating, Air, Plumbing, & Electrical
1912 S 3RD ST
2.76 mi away

1912 S 3rd St (rear unit)- New construction of a 2-Story detached Res. [3bed 2.5bath]. Part of 3-unit use.

ActiveMechanical PermitNewNov 2025
View Details
2025-053083 MP
๐Ÿ”งMasters HVAC LLC
1912 CROOKED LN
3.18 mi away

The home currently has two different sized feeder conductors running from the meter to the main electrical panel. We will remove the existing feeders and install new matching conductors. The replacement feeders will be 2/0 copper (CU) to ensure proper sizing safety and code compliance. All work will be completed per NEC standards and local utility requirements.

ActiveElectrical PermitRepairDec 2025
View Details
2025-157959 EP
๐Ÿ”งVoltsmith Electric
1912 CROOKED LN
3.18 mi away

Installation of solar panels on existing residential roof. 13.64 kW. Addition of 3 0-30A circuits. 31 panels.

ActiveElectrical PermitAuxiliary PowerSep 2025
View Details
2025-115673 EP
๐Ÿ”งION Developer LLC
1912 RUNNING BROOK DR
3.20 mi away

Install EVSE

FinalElectrical PermitSpecial Inspections ProgramSep 2025
View Details
2025-111497 EP
๐Ÿ”งGrayzer Electric LLC

๐Ÿ“Related Site Plans

City of Austin site plan approvals at this location

Quick Actions

TDLR ID: EABPRJB8824572

Property Owner

๐Ÿ‘ค
UNIVERSITY AT AUSTIN THE
4 projects ยท $4.9M
View company profile
JILL S. STEWART OR NINA HAMMOU 1301 E. DEAN KEETON STREET, AUSTIN, TX 78712

Design Firm

๐Ÿ›๏ธ
JACOBS GROUP
4 projects ยท $1.6M
View company profile
SARAH T SWEARER 2705 BEE CAVE ROAD, SUITE 300, AUSTIN, TX 78746

Registered Accessibility Specialist

๐Ÿ“‹
WEISS, MARTHA
RAS #336
7521 MAGENTA LN, AUSTIN, TX 78739