Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Browse by City
  • Browse by County

Resources

  • About Zabalist
  • Business Login
  • Contact Us
Data Sources
State RecordsTrade AssociationsCity PermitsSite Plans

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCA
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
โœ…Inspection Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

CP710803 SZB: MOVE PROJECT 2021 FROM FAC

1912 SPEEDWAY, Austin, TX 78712, Austin, TX, 78712
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8824572
$1.1M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
3 months
Duration
Registered:Aug 24, 2018
Start:Sep 1, 2018
Target:Dec 1, 2018
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

CP710803 SZB: MOVE PROJECT 2021 FROM FAC is a Renovation/Alteration project located at 1912 SPEEDWAY, Austin, TX 78712 in Austin, Texas. The project has an estimated value of $1.1M. UNIVERSITY OF TEXAS AT AUSTIN, THE is the property owner and JACOBS ENGINEERING is the design firm of record. The project was registered with TDLR on August 24, 2018.

๐Ÿ“‹Scope of Work

MOVE PROJECT 2021 FROM FAC AND GSB TO SZB

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 24, 2018
Inspection Complete
December 1, 2018
Construction Start
September 1, 2018
Expected Completion
December 1, 2018

๐Ÿ“…Project Timeline

Filed

Aug 24, 2018

Review Complete

Inspection Complete

Dec 1, 2018

Closed

๐Ÿ“Location & Views

Open in MapsGet Directions|30.28193, -97.73766

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$4.9M total
CP749722 MBB: CENIK LAB RENOVATION
Austinยท$34K
CP630432 BEL: TDLR CORRECTIONS
Austinยท$100K
UT WELCOME CENTER
Austinยท$4.5M
ADA RENOVATIONS PHASE 2
Austinยท$300K

๐Ÿ›๏ธSame Design Firm

$2.2M total
AMERITRUST
Fort Worthยท$1.0M
17 LCRR
Fort Worthยท$400K
NTCF RENOVATION
Fort Worthยท$200K
RAINWATER
Fort Worthยท$599K

๐Ÿ“Nearby Projects

Within 1 km
St. David's Recovery Center
2139 San Jacinto Boulevard, Austin, TX 78712ยท$3.0M
JCL + J2 Renovation
201 E. 21st St., Austin, TX 78705ยท$370K
SZB Classroom 2.802 Remodel
1912 Speedway, Austin, TX 78705ยท$900K
UT Cypress Bend
309 E 21st Street, Austin, TX 78705ยท$1.1M

๐Ÿ“„Related City Permits

Building permits found at or near this location

1912 S 3RD ST
2.76 mi away

New Autofill Pool for 1912 S 3RD ST

ActiveBuilding PermitNewMar 2026
View Details
2025-053086 BP
๐Ÿ”งJoseph Design Build**MAIN***
1912 CROOKED LN
3.18 mi away

Express: Foundation repair

FinalBuilding PermitRepairJan 2026
$1
View Details
2025-163609 BP
๐Ÿ”งArete Custom Builders LLC
1912 CROOKED LN
3.18 mi away

The home currently has two different sized feeder conductors running from the meter to the main electrical panel. We will remove the existing feeders and install new matching conductors. The replacement feeders will be 2/0 copper (CU) to ensure proper sizing safety and code compliance. All work will be completed per NEC standards and local utility requirements.

FinalElectrical PermitRepairDec 2025
View Details
2025-157959 EP
๐Ÿ”งVoltsmith Electric
1912 W STASSNEY LN
5.80 mi away

Addition of a Manual Transfer Switch and a service disconnect to the building the MTS will be installed after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other.

ActiveElectrical PermitRepairMar 2026
View Details
2025-107507 EP
๐Ÿ”งMiller Electric Company
1912 MAIZE BEND DR
10.59 mi away

Replacement of an existing water heater

FinalPlumbing PermitChange OutMar 2026
View Details
2026-025710 PP
๐Ÿ”งProven Plumbing LLC

๐Ÿ“Related Site Plans

City of Austin site plan approvals at this location

๐Ÿ“
JACK S. BLANTON MUSEUM OF ART
๐Ÿ“ 0.06 mi away
Approved and Released

Quick Actions

View on TDLRSatellite View
TDLR ID: EABPRJB8824572

Property Owner

๐Ÿ‘ค
University of Texas System and Affiliates
Contact: Registered by TDLR
4 projects ยท $4.9M
View company profile
JILL S. STEWART OR NINA HAMMOU 1301 E. DEAN KEETON STREET, AUSTIN, TX 78712
(512) 471-3042
www.austin.utexas.edu

Design Firm

๐Ÿ›๏ธ
Jacobs Engineering Group (and its variations)
4 projects ยท $2.2M
View company profile
SARAH T SWEARER 2705 BEE CAVE ROAD, SUITE 300, AUSTIN, TX 78746
(512) 314-3100
www.jacobs.com

Registered Accessibility Specialist

๐Ÿ“‹
WEISS, MARTHA
RAS #336
7521 MAGENTA LN, AUSTIN, TX 78739
(512) 900-7641

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78712
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects