SIGNATURE SYSTEMS
SIGNATURE SYSTEMS is a additions to existing building project at 1201 LAKESIDE DR. Suite #150, Flower Mound, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $260K.
๐Project Metrics
TDLR #EABPRJB8825093Project Closed
Project has been completed and closed
SIGNATURE SYSTEMS is a Additions to Existing Building project located at 1201 LAKESIDE DR. Suite #150, Flower Mound, TX 75028 in Flower Mound, Texas. The project has an estimated value of $260K. TRANSWESTERN is the property owner. The project was registered with TDLR on August 30, 2018.
โFrequently Asked Questions
What is SIGNATURE SYSTEMS?
SIGNATURE SYSTEMS is a additions to existing building project at 1201 LAKESIDE DR. Suite #150 in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office expansion within existing first-generation shell warehouse space.
Is SIGNATURE SYSTEMS open in Flower Mound?
Construction on SIGNATURE SYSTEMS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.
Where is SIGNATURE SYSTEMS located?
SIGNATURE SYSTEMS is located at 1201 LAKESIDE DR. Suite #150, Flower Mound, TX, 75028, in Dallas County.
Who is the owner or developer of SIGNATURE SYSTEMS?
TRANSWESTERN is the property owner/developer of record for SIGNATURE SYSTEMS, per its TDLR project registration.
How much does SIGNATURE SYSTEMS cost and how big is it?
SIGNATURE SYSTEMS has an estimated construction value of $260K, based on its TDLR filing.
๐Scope of Work
Interior office expansion within existing first-generation shell warehouse space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 30, 2018
Review Complete
Inspection Complete
Closed
Dec 1, 2018