Project intelligenceTDLR EABPRJB9804501Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

LISD | SHADOW RIDGE MS SEC VEST. RENO

2050 ABERDEEN DRIVE, Flower Mound, TX, 75028

Target date passed (Aug 2019)Project Registered

LISD | SHADOW RIDGE MS SEC VEST. RENO is a renovation/alteration project at 2050 ABERDEEN DRIVE, Flower Mound, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $186K.

Estimated project value
$186K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 5, 2018269 days across supplied datesAug 1, 2019

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75028 (Flower Mound)

One email per change. Unsubscribe in one click. Privacy.

LISD | SHADOW RIDGE MS SEC VEST. RENO is a Renovation/Alteration project located at 2050 ABERDEEN DRIVE, Flower Mound, TX 75028 in Flower Mound, Texas. The project has an estimated value of $186K. LEWISVILLE ISD is the property owner and HUCKABEE is the design firm of record. The project was registered with TDLR on November 5, 2018.

Frequently Asked Questions

What is LISD | SHADOW RIDGE MS SEC VEST. RENO?

LISD | SHADOW RIDGE MS SEC VEST. RENO is a renovation/alteration project at 2050 ABERDEEN DRIVE in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Security vestibule renovation at Shadow Ridge Middle School for Lewisville ISD.

Is LISD | SHADOW RIDGE MS SEC VEST. RENO open in Flower Mound?

LISD | SHADOW RIDGE MS SEC VEST. RENO was scheduled to finish construction in Aug 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is LISD | SHADOW RIDGE MS SEC VEST. RENO located?

LISD | SHADOW RIDGE MS SEC VEST. RENO is located at 2050 ABERDEEN DRIVE, Flower Mound, TX, 75028, in Denton County.

Who is the owner or developer of LISD | SHADOW RIDGE MS SEC VEST. RENO?

LEWISVILLE ISD is the property owner/developer of record for LISD | SHADOW RIDGE MS SEC VEST. RENO, per its TDLR project registration.

Who is the architect or design firm for LISD | SHADOW RIDGE MS SEC VEST. RENO?

HUCKABEE is the design firm of record for LISD | SHADOW RIDGE MS SEC VEST. RENO, according to its TDLR filing.

How much does LISD | SHADOW RIDGE MS SEC VEST. RENO cost and how big is it?

LISD | SHADOW RIDGE MS SEC VEST. RENO has an estimated construction value of $186K, based on its TDLR filing.

Scope of Work

Security vestibule renovation at Shadow Ridge Middle School for Lewisville ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2050 ABERDEEN DRIVE, Flower Mound, TX, 75028

Location by street address

Watch all construction in 75028 (Flower Mound)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Flower Mound?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.