Project intelligenceTDLR EABPRJB9805293New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL

133 SOUTH 4TH STREET, Van Vleck, TX, 77482

Construction complete · Aug 2021Project Closed

VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL is a new construction project at 133 SOUTH 4TH STREET, Van Vleck, in Matagorda County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $48.0M.

Estimated project value
$48.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 15, 2018990 days across supplied datesAug 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    943 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77482 (Van Vleck)

One email per change. Unsubscribe in one click. Privacy.

VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL is a New Construction project located at 133 SOUTH 4TH STREET, Van Vleck, TX 77482 in Van Vleck, Texas. The project has an estimated value of $48.0M. VAN VLECK INDEPENDENT SCHOOL DISTRICT is the property owner and PBK ARCHITECTS is the design firm of record. The project was registered with TDLR on November 15, 2018.

Frequently Asked Questions

What is VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL?

VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL is a new construction project at 133 SOUTH 4TH STREET in Van Vleck, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New combined High School and Middle School for 500 and 350 students respectively. Renovations to existing AG Bui

Is VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL open in Van Vleck?

Construction on VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL is complete — TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.

Where is VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL located?

VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL is located at 133 SOUTH 4TH STREET, Van Vleck, TX, 77482, in Matagorda County.

Who is the owner or developer of VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL?

VAN VLECK INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL, per its TDLR project registration.

Who is the architect or design firm for VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL?

PBK ARCHITECTS is the design firm of record for VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL, according to its TDLR filing.

How much does VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL cost and how big is it?

VAN VLECK NEW MIDDLE SCHOOL/HIGH SCHOOL has an estimated construction value of $48.0M, based on its TDLR filing.

Scope of Work

New combined High School and Middle School for 500 and 350 students respectively. Renovations to existing AG Bui

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

133 SOUTH 4TH STREET, Van Vleck, TX, 77482

Loading location map…
29.01685, -95.88811

Watch all construction in 77482 (Van Vleck)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Van Vleck?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.