TERRACE RR/CORRIDOR - 4TH FLOOR
TERRACE RR/CORRIDOR - 4TH FLOOR is a renovation/alteration project at 2600 VIA FORTUNA Bldg 1, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2019). The project has an estimated value of $60K.
๐Project Metrics
TDLR #EABPRJB9805540Project Closed
Project has been completed and closed
TERRACE RR/CORRIDOR - 4TH FLOOR is a Renovation/Alteration project located at 2600 VIA FORTUNA Bldg 1, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $60K. TIER REIT is the property owner and SIXTHRIVER is the design firm of record. The project was registered with TDLR on November 19, 2018.
โFrequently Asked Questions
What is TERRACE RR/CORRIDOR - 4TH FLOOR?
TERRACE RR/CORRIDOR - 4TH FLOOR is a renovation/alteration project at 2600 VIA FORTUNA Bldg 1 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Alteration of interior finishes in restroom andcorridor
Is TERRACE RR/CORRIDOR - 4TH FLOOR open in Austin?
Construction on TERRACE RR/CORRIDOR - 4TH FLOOR is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2019. The building is finished and very likely open.
Where is TERRACE RR/CORRIDOR - 4TH FLOOR located?
TERRACE RR/CORRIDOR - 4TH FLOOR is located at 2600 VIA FORTUNA Bldg 1, Austin, TX, 78746, in Travis County.
Who is the owner or developer of TERRACE RR/CORRIDOR - 4TH FLOOR?
TIER REIT is the property owner/developer of record for TERRACE RR/CORRIDOR - 4TH FLOOR, per its TDLR project registration.
Who is the architect or design firm for TERRACE RR/CORRIDOR - 4TH FLOOR?
SIXTHRIVER is the design firm of record for TERRACE RR/CORRIDOR - 4TH FLOOR, according to its TDLR filing.
How much does TERRACE RR/CORRIDOR - 4TH FLOOR cost and how big is it?
TERRACE RR/CORRIDOR - 4TH FLOOR has an estimated construction value of $60K, based on its TDLR filing.
๐Scope of Work
Interior Alteration of interior finishes in restroom andcorridor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 19, 2018
Review Complete
Inspection Complete
Closed
Mar 1, 2019
๐Related Projects
๐คSame Owner
$280K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Existing 200 amp underground service is having problems and needs to be replaced. AE disconnect will be needed.
To replace residential service from an overhead service to an underground service going through the back yard to the propertys owners home. The underground run will go around the exterior of the back yard and avoid running through the center of the backyard going to the panel.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System