NAVIDAR
NAVIDAR is a renovation/alteration project at 2700 VIA FORTUNA, SUITE 140, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2019). The project has an estimated value of $80K across about 1,980 sq ft.
๐Project Metrics
TDLR #TABS2019006491Project Closed
Project has been completed and closed
NAVIDAR is a Renovation/Alteration project located at 2700 VIA FORTUNA, SUITE 140, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $80K covering 1,980 sq ft. TIER REIT is the property owner and Sixthriver is the design firm of record. The project was registered with TDLR on March 7, 2019.
โFrequently Asked Questions
What is NAVIDAR?
NAVIDAR is a renovation/alteration project at 2700 VIA FORTUNA, SUITE 140 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR ALTERATION OF EXISTING OFFICE SPACE.
Is NAVIDAR open in Austin?
Construction on NAVIDAR is complete โ TDLR records show the project passed its required accessibility inspection in May 2019. The building is finished and very likely open.
Where is NAVIDAR located?
NAVIDAR is located at 2700 VIA FORTUNA, SUITE 140, Austin, TX, 78746, in Travis County.
Who is the owner or developer of NAVIDAR?
TIER REIT is the property owner/developer of record for NAVIDAR, per its TDLR project registration.
Who is the architect or design firm for NAVIDAR?
Sixthriver is the design firm of record for NAVIDAR, according to its TDLR filing.
How much does NAVIDAR cost and how big is it?
NAVIDAR has an estimated construction value of $80K and approximately 1,980 square feet (about $40/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR ALTERATION OF EXISTING OFFICE SPACE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 7, 2019
Review Complete
Inspection Complete
Closed
May 31, 2019
๐Related Projects
๐คSame Owner
$280K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton horizontal split system with like-for-like capacity
Remodel/addition of a existing two-story single family residence 5 bed/5.5 bathroom removing driveway combing lots under unified development agreement
Electrical repair for existing home Electrical system its currently with aluminum wire and all the outlets and switches will be remediate with AlumiConn pigtails to tie in to the copper new deep boxes installed in some places. Electrical work only will be performed.
Install Irrigation system
install/replace 200 amp main breaker panel and meter can (underground)