SH 71
SH 71 is a renovation/alteration project at From FM 2765 to FM 1300, El Campo, in Wharton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2021). The project has an estimated value of $210K across about 23,200 sq ft.
๐Project Metrics
TDLR #TABS2019000949Project Closed
Project has been completed and closed
SH 71 is a Renovation/Alteration project located at From FM 2765 to FM 1300, El Campo, TX 77437 in El Campo, Texas. The project has an estimated value of $210K covering 23,200 sq ft. TxDOT District : Yoakum is the property owner and CH2M is the design firm of record. The project was registered with TDLR on December 14, 2018.
โFrequently Asked Questions
What is SH 71?
SH 71 is a renovation/alteration project at From FM 2765 to FM 1300 in El Campo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen roadway.
Is SH 71 open in El Campo?
Construction on SH 71 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2021. The building is finished and very likely open.
Where is SH 71 located?
SH 71 is located at From FM 2765 to FM 1300, El Campo, TX, 77437, in Wharton County.
Who is the owner or developer of SH 71?
TxDOT District : Yoakum is the property owner/developer of record for SH 71, per its TDLR project registration.
Who is the architect or design firm for SH 71?
CH2M is the design firm of record for SH 71, according to its TDLR filing.
How much does SH 71 cost and how big is it?
SH 71 has an estimated construction value of $210K and approximately 23,200 square feet (about $9/sqft), based on its TDLR filing.
๐Scope of Work
Widen roadway.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 14, 2018
Review Complete
Inspection Complete
Closed
Sep 23, 2021