Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Morriss Road Improvements
3000 Morriss Road, Flower Mound, TX, 75028
Morriss Road Improvements is a renovation/alteration project at 3000 Morriss Road, Flower Mound, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2020). The project has an estimated value of $450K across about 30,000 sq ft.
- Estimated project value
- $450K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 30,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $15/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
99 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
396 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75028 (Flower Mound)
One email per change. Unsubscribe in one click. Privacy.
Morriss Road Improvements is a Renovation/Alteration project located at 3000 Morriss Road, Flower Mound, TX 75028 in Flower Mound, Texas. The project has an estimated value of $450K covering 30,000 sq ft. Town of Flower Mound is the property owner and Halff Associates, Inc. is the design firm of record. The project was registered with TDLR on January 22, 2019.
Frequently Asked Questions
What is Morriss Road Improvements?
Morriss Road Improvements is a renovation/alteration project at 3000 Morriss Road in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Road widening, new sidewalk and pedestrian ramps, road panel replacements, sidewalk replacement
Is Morriss Road Improvements open in Flower Mound?
Construction on Morriss Road Improvements is complete — TDLR records show the project passed its required accessibility inspection in May 2020. The building is finished and very likely open.
Where is Morriss Road Improvements located?
Morriss Road Improvements is located at 3000 Morriss Road, Flower Mound, TX, 75028, in Denton County.
Who is the owner or developer of Morriss Road Improvements?
Town of Flower Mound is the property owner/developer of record for Morriss Road Improvements, per its TDLR project registration.
Who is the architect or design firm for Morriss Road Improvements?
Halff Associates, Inc. is the design firm of record for Morriss Road Improvements, according to its TDLR filing.
How much does Morriss Road Improvements cost and how big is it?
Morriss Road Improvements has an estimated construction value of $450K and approximately 30,000 square feet (about $15/sqft), based on its TDLR filing.
Scope of Work
Road widening, new sidewalk and pedestrian ramps, road panel replacements, sidewalk replacement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3000 Morriss Road, Flower Mound, TX, 75028
Related Projects
Same Owner
$75.9M totalWatch all construction in 75028 (Flower Mound)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Flower Mound?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.