Project intelligenceTDLR TABS2019008496New Construction
Funding type

This project is privately funded, on private land for private use.

Parmer Village Lot 1,2,3 Site Development Plan in Austin, TX

900 E. Parmer Lane, Austin, TX, 78753

Target date passed (Jan 2025)Review Complete

Parmer Village Lot 1,2,3 Site Development Plan is a new construction project at 900 E. Parmer Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.3M across about 617,245 sq ft.

Estimated project value
$3.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
617,245 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 3, 20192,130 days across supplied datesJan 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    120 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2,010 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78753 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Parmer Village Lot 1,2,3 Site Development Plan is a New Construction project located at 900 E. Parmer Lane, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $3.3M covering 617,245 sq ft. LY_NGUYEN, LLC is the property owner and FTC Architects is the design firm of record. The project was registered with TDLR on April 3, 2019.

Frequently Asked Questions

What is Parmer Village Lot 1,2,3 Site Development Plan?

Parmer Village Lot 1,2,3 Site Development Plan is a new construction project at 900 E. Parmer Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 14.17 acres site development project

Is Parmer Village Lot 1,2,3 Site Development Plan open in Austin?

Parmer Village Lot 1,2,3 Site Development Plan was scheduled to finish construction in Jan 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Parmer Village Lot 1,2,3 Site Development Plan located?

Parmer Village Lot 1,2,3 Site Development Plan is located at 900 E. Parmer Lane, Austin, TX, 78753, in Travis County.

Who is the owner or developer of Parmer Village Lot 1,2,3 Site Development Plan?

LY_NGUYEN, LLC is the property owner/developer of record for Parmer Village Lot 1,2,3 Site Development Plan, per its TDLR project registration.

Who is the architect or design firm for Parmer Village Lot 1,2,3 Site Development Plan?

FTC Architects is the design firm of record for Parmer Village Lot 1,2,3 Site Development Plan, according to its TDLR filing.

How much does Parmer Village Lot 1,2,3 Site Development Plan cost and how big is it?

Parmer Village Lot 1,2,3 Site Development Plan has an estimated construction value of $3.3M and approximately 617,245 square feet (about $5/sqft), based on its TDLR filing.

Scope of Work

14.17 acres site development project

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

900 E. Parmer Lane, Austin, TX, 78753

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

9000 BINNEWATER WAY

New construction single-family residential 1-story 4 bedroom 3.5 baths with 3 car-garage covered front porch and covered rear patio.

ActiveElectrical PermitNewNov 2026
View Details
2026-116451 EP
Airco Mechanical LTD
9007 GEORGIAN DR

Replacement of complete existing central heat and air system with or without duct work Change out like for like

ActiveMechanical PermitChange OutNov 2026
View Details
2026-150991 MP
Riptide Mechanical LLC
9008 SPRING LAKE DR

Interior remodel Remodel master bed remove non load bearing interior walls relocate and replace lavatories toilet shower in master

ActivePlumbing PermitAddition and RemodelNov 2026
View Details
2026-133681 PP
H&M PLUMBING
9009 CAPITOL VIEW DR BLDG 1

Replacement of a damaged 1200A main circuit breaker feeding an existing meter center. Austin Energy de-energized service for the repair. Replacement is complete. City electrical inspector inspected and approved the repair on November 17 2026 and notified Austin Energy. Permit requested for completed repair and restoration of power.

FinalElectrical PermitRepairNov 2026
View Details
2026-150796 EP
M&M Electrical Contractors
900 S CAPITAL OF TEXAS HWY SB BLDG 4 UNIT 125

Interior remodel for fitness use on first floor 1.

ActiveBuilding PermitRemodelNov 2026
View Details
2026-128539 BP
Maloba Builders and Services

Watch all construction in 78753 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.