Bowie High School Package 2 Traffic & Site Improvements
๐Project Metrics
TDLR #TABS2019010970Project Closed
Project has been completed and closed
๐Scope of Work
Parking, traffic and site improvements including modified drop-off/pick-up, new band practice lot, and the construction of anew parking garage with rooftop tennis courts.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐Related City Permits
Building permits found at or near this location
New Pool (438sqft) and Spa (53 sqft) with pervious turf (non-compacted base)
New installation of light poles for existing public education
Install new 2 ton 17 Seer multi stage system.
install/replace 200 amp main breaker panel and meter can (underground)
Stand-Alone - CONDUIT ONLY PERMIT Work consists of conduit work for the new sports complex at Bowie High School. Work that is involved: CONDUIT ONLY: For Sports Lighting Scoreboards Time-Clocks Pressboxes Was granted the permission by Interim Director Keith Mars to pull a Stand Alone for CONDUIT ONLY so we are not delayed. The Conditional Site Permit was based off the Site Plan Number: SP-2024-0439CX. All other work outside of Conduit work will be installed and inspected once the building permit is submitted.