Robinson Avenue Phase 2 - Street and Drainage Improvements
Robinson Avenue, El Paso, TX, 79902
Robinson Avenue Phase 2 - Street and Drainage Improvements is a renovation/alteration project at Robinson Avenue, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $170.0M across about 100,000 sq ft.
- Estimated project value
- $170.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 100,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.70K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
24 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
60 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79902 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
Robinson Avenue Phase 2 - Street and Drainage Improvements is a Renovation/Alteration project located at Robinson Avenue, El Paso, TX 79902 in El Paso, Texas. The project has an estimated value of $170.0M covering 100,000 sq ft. City of El Paso is the property owner and Moreno Cardenas Inc. is the design firm of record. The project was registered with TDLR on May 8, 2019.
Frequently Asked Questions
What is Robinson Avenue Phase 2 - Street and Drainage Improvements?
Robinson Avenue Phase 2 - Street and Drainage Improvements is a renovation/alteration project at Robinson Avenue in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: provide street and drainage improvements for Robinson Avenue between Virginia Street and Piedmont Street. Improvements consist of providing new asphalt, sidewalks, curb and gutter, parkway, landscaping, irrigation and drainage infrastruc…
Is Robinson Avenue Phase 2 - Street and Drainage Improvements open in El Paso?
Robinson Avenue Phase 2 - Street and Drainage Improvements was scheduled to finish construction in Jul 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Robinson Avenue Phase 2 - Street and Drainage Improvements located?
Robinson Avenue Phase 2 - Street and Drainage Improvements is located at Robinson Avenue, El Paso, TX, 79902, in El Paso County.
Who is the owner or developer of Robinson Avenue Phase 2 - Street and Drainage Improvements?
City of El Paso is the property owner/developer of record for Robinson Avenue Phase 2 - Street and Drainage Improvements, per its TDLR project registration.
Who is the architect or design firm for Robinson Avenue Phase 2 - Street and Drainage Improvements?
Moreno Cardenas Inc. is the design firm of record for Robinson Avenue Phase 2 - Street and Drainage Improvements, according to its TDLR filing.
How much does Robinson Avenue Phase 2 - Street and Drainage Improvements cost and how big is it?
Robinson Avenue Phase 2 - Street and Drainage Improvements has an estimated construction value of $170.0M and approximately 100,000 square feet (about $1.70K/sqft), based on its TDLR filing.
Scope of Work
provide street and drainage improvements for Robinson Avenue between Virginia Street and Piedmont Street. Improvements consist of providing new asphalt, sidewalks, curb and gutter, parkway, landscaping, irrigation and drainage infrastructure
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Robinson Avenue, El Paso, TX, 79902
Related Projects
Same Owner
$1.31B totalWatch all construction in 79902 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.