El Dorado High School Renovations & Additions in El Paso, TX
12401 Edgemere Blvd., El Paso, TX, 79938
El Dorado High School Renovations & Additions is a new construction project at 12401 Edgemere Blvd., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $27.0M across about 183,263 sq ft.
- Estimated project value
- $27.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 183,263 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $147/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
37 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
1,300 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About El Dorado High School Renovations & Additions
Socorro Independent School District completed a $27,000,000 expansion of El Dorado High School in El Paso, adding 183,263 square feet of new construction. The project, registered with TDLR in May 2019, included a new music building, architectural gallery, black box facility, science rooms, concessions building, CTE building, enlarged dining area, and a greenhouse. TDLR closed the project file in January 2023, marking the end of the accessibility review process for this construction.
Project Scope and Design
PSRBB Commercial Group Inc. served as the design firm of record for the renovations and additions. The scope of work focused on expanding the campus with dedicated facilities for arts, sciences, and career technical education. The construction phase began in June 2019 and continued until the final filing in early 2023. This timeline represented a scheduled build window of 1,300 days, which is longer than the county median of 214 days for new construction projects in El Paso County.
The estimated cost of $27,000,000 translates to $147 per square foot. This figure is above the county median of $111 per square foot for similar new construction filings. The total cost is also above the county median estimated cost of $800,000, placing the project in the top quarter of filings by value. The project utilized public funds and was located on public land, consistent with the district's status as a public educational institution.
Regional Context and Ownership
Socorro Independent School District is the owner of record for this and several other recent projects in the area. The district has six other TDLR-registered projects totaling $80,075,000, including improvements to the Socorro ISD Auxiliary GYM and the construction of Combo School - Eastlake. These projects reflect a sustained investment in educational infrastructure across El Paso County. The district's portfolio includes both large-scale new constructions and smaller improvement projects, demonstrating a varied approach to facility development.
PSRBB Commercial Group Inc. has worked on six other TDLR-registered projects in the region, with a combined value of $2,752,000. Their other projects include the Sunland Park Strip Center and Montwood Mall. While these projects vary in type and scale, they share the same design firm of record. The El Dorado High School project stands out for its size and scope, representing one of the larger educational construction efforts in the area.
The project is located at 12401 Edgemere Blvd., El Paso, TX 79938, in a ZIP code with a population of about 97,851 people. Median household income in the area is $75,801, and the median owner-occupied home value is $199,700. The construction of such a large facility contributes to the local labor market, with El Paso County unemployment at 4.8 percent in July 2026. The completion of this project adds significant capacity to the district's educational offerings.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79938 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
El Dorado High School Renovations & Additions is a New Construction project located at 12401 Edgemere Blvd., El Paso, TX 79938 in El Paso, Texas. The project has an estimated value of $27.0M covering 183,263 sq ft. Socorro Independent School District is the property owner and PSRBB Commercial Group Inc. is the design firm of record. The project was registered with TDLR on May 24, 2019.
Frequently Asked Questions
Is El Dorado High School open?
The TDLR record indicates the construction project closed in January 2023. The record does not provide information about the school's daily operating status or public access, only the completion of the construction and accessibility review process.
Who designed the El Dorado High School expansion?
PSRBB Commercial Group Inc. is listed as the design firm of record for the El Dorado High School Renovations & Additions project. They were responsible for the design of the new music building, gallery, and other additions.
How much did the El Dorado High School project cost?
The estimated cost for the new construction and additions was $27,000,000. This equates to $147 per square foot for the 183,263 square feet of new space added to the campus.
What new facilities were added to El Dorado High School?
The expansion included a new music building, architectural gallery, black box facility, science rooms addition, concessions building, CTE building, enlarged dining area, and a greenhouse building.
When did construction on the El Dorado High School project finish?
TDLR closed the project file in January 2023. The construction start date was June 2019, and the completion date on the filing was January 2023.
What is El Dorado High School Renovations & Additions?
El Dorado High School Renovations & Additions is a new construction project at 12401 Edgemere Blvd. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building Additions consists of New Music Building, Architectural Gallery, Black Box Facility, Science Rooms Addition, Concessions Building, CTE Building, Enlargement of Dining Area and a Greenhouse Building.
Is El Dorado High School Renovations & Additions open in El Paso?
Construction on El Dorado High School Renovations & Additions is complete — TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.
Where is El Dorado High School Renovations & Additions located?
El Dorado High School Renovations & Additions is located at 12401 Edgemere Blvd., El Paso, TX, 79938, in El Paso County.
Who is the owner or developer of El Dorado High School Renovations & Additions?
Socorro Independent School District is the property owner/developer of record for El Dorado High School Renovations & Additions, per its TDLR project registration.
Who is the architect or design firm for El Dorado High School Renovations & Additions?
PSRBB Commercial Group Inc. is the design firm of record for El Dorado High School Renovations & Additions, according to its TDLR filing.
How much does El Dorado High School Renovations & Additions cost and how big is it?
El Dorado High School Renovations & Additions has an estimated construction value of $27.0M and approximately 183,263 square feet (about $147/sqft), based on its TDLR filing.
Scope of Work
Building Additions consists of New Music Building, Architectural Gallery, Black Box Facility, Science Rooms Addition, Concessions Building, CTE Building, Enlargement of Dining Area and a Greenhouse Building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
12401 Edgemere Blvd., El Paso, TX, 79938
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$320.0M totalWatch all construction in 79938 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.