Project intelligenceTDLR TABS2020001619Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Controlled Entry - Phase II-Aledo Middle School

416 FM 1187, Aledo, TX, 76008

Target date passed (Mar 2020)Review Complete

Controlled Entry - Phase II-Aledo Middle School is a renovation/alteration project at 416 FM 1187, Aledo, in Parker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $50K across about 500 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$100/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 24, 2019188 days across supplied datesMar 30, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    166 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76008 (Aledo)

One email per change. Unsubscribe in one click. Privacy.

Controlled Entry - Phase II-Aledo Middle School is a Renovation/Alteration project located at 416 FM 1187, Aledo, TX 76008 in Aledo, Texas. The project has an estimated value of $50K covering 500 sq ft. Aledo Independent School District is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on September 24, 2019.

Frequently Asked Questions

What is Controlled Entry - Phase II-Aledo Middle School?

Controlled Entry - Phase II-Aledo Middle School is a renovation/alteration project at 416 FM 1187 in Aledo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations to the reception area and adding access control.

Is Controlled Entry - Phase II-Aledo Middle School open in Aledo?

Controlled Entry - Phase II-Aledo Middle School was scheduled to finish construction in Mar 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Controlled Entry - Phase II-Aledo Middle School located?

Controlled Entry - Phase II-Aledo Middle School is located at 416 FM 1187, Aledo, TX, 76008, in Parker County.

Who is the owner or developer of Controlled Entry - Phase II-Aledo Middle School?

Aledo Independent School District is the property owner/developer of record for Controlled Entry - Phase II-Aledo Middle School, per its TDLR project registration.

Who is the architect or design firm for Controlled Entry - Phase II-Aledo Middle School?

VLK Architects Inc is the design firm of record for Controlled Entry - Phase II-Aledo Middle School, according to its TDLR filing.

How much does Controlled Entry - Phase II-Aledo Middle School cost and how big is it?

Controlled Entry - Phase II-Aledo Middle School has an estimated construction value of $50K and approximately 500 square feet (about $100/sqft), based on its TDLR filing.

Scope of Work

Interior renovations to the reception area and adding access control.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

416 FM 1187, Aledo, TX, 76008

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76008 (Aledo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.