Procore 11th floor
Procore 11th floor is a renovation/alteration project at 221 W 6th Street 11th floor, Austin, in Austin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2020). The project has an estimated value of $1.5M across about 14,300 sq ft.
๐Project Metrics
TDLR #TABS2020005767Project Closed
Project has been completed and closed
Procore 11th floor is a Renovation/Alteration project located at 221 W 6th Street 11th floor, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.5M covering 14,300 sq ft. Lincoln Property Company is the property owner and Interior Architects is the design firm of record. The project was registered with TDLR on November 19, 2019.
โFrequently Asked Questions
What is Procore 11th floor?
Procore 11th floor is a renovation/alteration project at 221 W 6th Street 11th floor in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior renovation of existing core and shwll buildout.
Is Procore 11th floor open in Austin?
Construction on Procore 11th floor is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2020. The building is finished and very likely open.
Where is Procore 11th floor located?
Procore 11th floor is located at 221 W 6th Street 11th floor, Austin, TX, 78701, in Austin County.
Who is the owner or developer of Procore 11th floor?
Lincoln Property Company is the property owner/developer of record for Procore 11th floor, per its TDLR project registration.
Who is the architect or design firm for Procore 11th floor?
Interior Architects is the design firm of record for Procore 11th floor, according to its TDLR filing.
How much does Procore 11th floor cost and how big is it?
Procore 11th floor has an estimated construction value of $1.5M and approximately 14,300 square feet (about $105/sqft), based on its TDLR filing.
๐Scope of Work
interior renovation of existing core and shwll buildout.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 19, 2019
Review Complete
Inspection Complete
Closed
Apr 30, 2020
๐Related Projects
๐คSame Owner
$1.28B total๐Related City Permits
Building permits found at or near this location
Interior remodel and garage conversion Interior remodel and garage addition (conversion) to existing sfr including framing modifications new laundry and half bath
7 DAY - interior remodel existing office areas - OVA
Interior Remodel - Drywall replacement kitchen cabinets new floors bringing electrical and plumbing up to code (New water and wastewater lines) countertops
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Remove and replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.