Project intelligenceTDLR TABS2020006378New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Weimar Pool and Splash Pad

106 West Market Street, Weimar, TX, 78962

Construction complete · Jun 2020Inspection Complete

Weimar Pool and Splash Pad is a new construction project at 106 West Market Street, Weimar, in Colorado County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2020). The project has an estimated value of $1.5M across about 19,250 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
19,250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$78/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 27, 2019187 days across supplied datesJun 1, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    12 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    175 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78962 (Weimar)

One email per change. Unsubscribe in one click. Privacy.

Weimar Pool and Splash Pad is a New Construction project located at 106 West Market Street, Weimar, TX 78962 in Weimar, Texas. The project has an estimated value of $1.5M covering 19,250 sq ft. City of Weimar is the property owner and The C.T. Brannon Corporation is the design firm of record. The project was registered with TDLR on November 27, 2019.

Frequently Asked Questions

What is Weimar Pool and Splash Pad?

Weimar Pool and Splash Pad is a new construction project at 106 West Market Street in Weimar, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New swimming pool, splash pad, pool deck, sidewalk, and ADA parking

Is Weimar Pool and Splash Pad open in Weimar?

Construction on Weimar Pool and Splash Pad is complete — TDLR records show the project passed its required accessibility inspection in Jun 2020. The building is finished and very likely open.

Where is Weimar Pool and Splash Pad located?

Weimar Pool and Splash Pad is located at 106 West Market Street, Weimar, TX, 78962, in Colorado County.

Who is the owner or developer of Weimar Pool and Splash Pad?

City of Weimar is the property owner/developer of record for Weimar Pool and Splash Pad, per its TDLR project registration.

Who is the architect or design firm for Weimar Pool and Splash Pad?

The C.T. Brannon Corporation is the design firm of record for Weimar Pool and Splash Pad, according to its TDLR filing.

How much does Weimar Pool and Splash Pad cost and how big is it?

Weimar Pool and Splash Pad has an estimated construction value of $1.5M and approximately 19,250 square feet (about $78/sqft), based on its TDLR filing.

Scope of Work

New swimming pool, splash pad, pool deck, sidewalk, and ADA parking

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

106 West Market Street, Weimar, TX, 78962

Loading location map…
29.70094, -96.78192

Watch all construction in 78962 (Weimar)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.