Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Doris Roznovak Aquatic Center in Taylor, TX
1600 Veterans Drive, Taylor, TX, 76574
Doris Roznovak Aquatic Center is a renovation/alteration project at 1600 Veterans Drive, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $6.7M across about 58,000 sq ft.
- Estimated project value
- $6.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 58,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $116/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
95 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
231 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
363 days after the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76574 (Taylor)
One email per change. Unsubscribe in one click. Privacy.
Doris Roznovak Aquatic Center is a Renovation/Alteration project located at 1600 Veterans Drive, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $6.7M covering 58,000 sq ft. City of Taylor is the property owner and The C.T. Brannon Corporation is the design firm of record. The project was registered with TDLR on July 1, 2024.
Frequently Asked Questions
What is Doris Roznovak Aquatic Center?
Doris Roznovak Aquatic Center is a renovation/alteration project at 1600 Veterans Drive in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing office, bath house, and pump house; Construction of new pool, play structure, water slide, and pool deck
Is Doris Roznovak Aquatic Center open in Taylor?
Construction on Doris Roznovak Aquatic Center is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is Doris Roznovak Aquatic Center located?
Doris Roznovak Aquatic Center is located at 1600 Veterans Drive, Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of Doris Roznovak Aquatic Center?
City of Taylor is the property owner/developer of record for Doris Roznovak Aquatic Center, per its TDLR project registration.
Who is the architect or design firm for Doris Roznovak Aquatic Center?
The C.T. Brannon Corporation is the design firm of record for Doris Roznovak Aquatic Center, according to its TDLR filing.
How much does Doris Roznovak Aquatic Center cost and how big is it?
Doris Roznovak Aquatic Center has an estimated construction value of $6.7M and approximately 58,000 square feet (about $116/sqft), based on its TDLR filing.
Scope of Work
Renovations to existing office, bath house, and pump house; Construction of new pool, play structure, water slide, and pool deck
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1600 Veterans Drive, Taylor, TX, 76574
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Related City Permits
Building permits found at or near this location
Construction of New 5-Unit 3-story single bldg residential multi-family townhomes.
ePlan: Expedited - Accessory Retail Shell **NOT FOR OCCUPANCY (2809 sf.) jack 785-761-6615
Change of use and remodel to expand pilates studio. This phase remodels 120 and then combines units 120 (1494SF) and 130 (1598SF) 3092 sf total - Phase 2 scope.
Change of use and remodel to expand pilates studio. This phase remodels 120 and then combines units 120 (1494SF) and 130 (1598SF) 3092 sf total - Phase 2 scope.
Change of use and remodel to expand pilates studio. This phase remodels 120 and then combines units 120 (1494SF) and 130 (1598SF) 3092 sf total - Phase 2 scope.
Watch all construction in 76574 (Taylor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Taylor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.